Jmc General Construction
- Based in
- Redwood City
- On San Francisco permits
- May 2013 to Dec 2024
- Last 24 months
- 1 permit filed
12 permits since 2000: 5 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 expired or cancelled. Typically 36 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2019 | Expired or cancelled revoked May 2019 | 173 Gambier St | 1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permitDetails
1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permit | $175,000 |