Back to bathroom remodel contractors
Jmc General Construction
- Based in
- Redwood City
- On San Francisco permits
- May 2013 to Dec 2024
- Last 24 months
- 1 permit filed
12 permits since 2000: 5 completed, 1 in progress, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
8 bathroom remodel permits: 3 completed, 1 in progress, 1 never finaled, 3 expired or cancelled. Typically 6 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 3, 2024 | In progress issued Dec 2024 | 747 Teresita Bl | legalizing permiting bathroom on first floor- already existing wasn't permitted. bring into code for bathroom and closet. all work on first floor.Details
legalizing permiting bathroom on first floor- already existing wasn't permitted. bring into code for bathroom and closet. all work on first floor. | |
| Oct 1, 2024 | Completed final sign-off Feb 2025 | 747 Teresita Bl | remodel one bathroom like for like. new paint, tile, new fixtures, shower door, faucet. no change to floor layout. no change to wall layout. no structural work.Details
remodel one bathroom like for like. new paint, tile, new fixtures, shower door, faucet. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| Jan 15, 2021 | Expired or cancelled suspend Aug 2022 | 2785 Union St | convert kitchen pantry space to a bathroomDetails
convert kitchen pantry space to a bathroom | $15,000 |
| Nov 6, 2020 | Completed final sign-off Mar 2021 | 19 Dearborn St | unit #4: kitchen remodel: same to same, no changes, new cabinets, new countertop, new 6 rescess lights, new plug. bathroom remodel: like to like, no changes, new tub, new floor tile, new wall tile and replacement of fanDetails
unit #4: kitchen remodel: same to same, no changes, new cabinets, new countertop, new 6 rescess lights, new plug. bathroom remodel: like to like, no changes, new tub, new floor tile, new wall tile and replacement of fan | $20,000 |
| May 2, 2019 | Expired or cancelled withdrawn Jan 2024 | 854 43rd Av | g/f only: drywall garage/basement. add recessed lights to the basement. add general plugs, refinish bathroom.Details
g/f only: drywall garage/basement. add recessed lights to the basement. add general plugs, refinish bathroom. | $15,000 |
| Feb 7, 2019 | Expired or cancelled revoked May 2019 | 173 Gambier St | 1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permitDetails
1st fl - relocate(e)stair, add 3 bedrm, 2 full bath, relocate laundry, strengthening(e)rear foundation. replace water damaged lower roof; remove brick chimney; 2nd fl -relocate (e) kitchen to rear; remove(e)rear bedrm; install new interior stair.remodel kitchen/bathrm.roof deck under separate permit | $175,000 |
| Jul 19, 2017 | Completed final sign-off May 2018 | 348 Madison St | 1st fl:convert storage area @ 1/f to master bedroom/bathroom, add 2nd bathroom, & strengthening foundation. extend rear deck @ 2/f (150sf). add 2 dormers in attic floor & new full bathroom. upgrade electric, plumbing, mechanical.Details
1st fl:convert storage area @ 1/f to master bedroom/bathroom, add 2nd bathroom, & strengthening foundation. extend rear deck @ 2/f (150sf). add 2 dormers in attic floor & new full bathroom. upgrade electric, plumbing, mechanical. | $150,000 |
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 14 Laguna St | 3/f: 1 bathroom remodel, new plumbing- sink & shower, new tile, some framing. reduce size of (e) closet for new shower. n/a ordinance #155-13Details
3/f: 1 bathroom remodel, new plumbing- sink & shower, new tile, some framing. reduce size of (e) closet for new shower. n/a ordinance #155-13 | $7,000 |