Back to kitchen remodel contractors
Jin Qing Construction Co.
- Based in
- Millbrae
- On San Francisco permits
- Jul 2005 to Aug 2017
- Last 24 months
- 0 permits filed
47 permits since 2000: 40 completed, 7 never finaled.
Of the 7 never-finaled permits, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
11 kitchen remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 146 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2017 | Completed final sign-off Sep 2017 | 20 Meadowbrook Dr | to comply with complaint 201784421 - additional work to pa 2017-0425-4883 & reconfigure interior layout. 2nd floor - relocate kitchen & bathroom, add study room & bathroom; 1st floor - relocate family room, add 1 bedroom, 1 full bath, wet bar & relocate washer & dryer per planDetails
to comply with complaint 201784421 - additional work to pa 2017-0425-4883 & reconfigure interior layout. 2nd floor - relocate kitchen & bathroom, add study room & bathroom; 1st floor - relocate family room, add 1 bedroom, 1 full bath, wet bar & relocate washer & dryer per plan | $75,000 |
| Apr 25, 2017 | Completed final sign-off Sep 2017 | 20 Meadowbrook Dr | remodel kitchen & (2) bathrooms, replace interior finishes with 5/8" type "x" gyp. bd. in-kind, no moving walls, replace in same location.Details
remodel kitchen & (2) bathrooms, replace interior finishes with 5/8" type "x" gyp. bd. in-kind, no moving walls, replace in same location. | $45,000 |
| Nov 10, 2015 | Completed final sign-off Oct 2016 | 2055 35th Av | remodle kitchen & 2 bath rooms & replace interior finishes with 5/*" type x gyp. bd. all lighting comply with cec 2013 using existing ducts.Details
remodle kitchen & 2 bath rooms & replace interior finishes with 5/*" type x gyp. bd. all lighting comply with cec 2013 using existing ducts. | $45,000 |
| Oct 9, 2015 | Completed final sign-off Sep 2016 | 1539 29th Av | remodel kitchen, (3) bathrooms, replace kitchen cabinets, sink, bath tubs, toilet, vanity, floor tiles & replace interior finishes with 5/8" type "x" gyp bd.Details
remodel kitchen, (3) bathrooms, replace kitchen cabinets, sink, bath tubs, toilet, vanity, floor tiles & replace interior finishes with 5/8" type "x" gyp bd. | $55,000 |
| Apr 10, 2015 | Completed final sign-off Nov 2015 | 1722 31st Av | remodel kitchen ; (3) bedrroms, (2) bath & replace interior finishes. w/ 5/*" type x typ. bd. ; no change to layout and walls. to comply with cec150.0(k)3 & 5.Details
remodel kitchen ; (3) bedrroms, (2) bath & replace interior finishes. w/ 5/*" type x typ. bd. ; no change to layout and walls. to comply with cec150.0(k)3 & 5. | $54,000 |
| Jan 14, 2015 | Completed final sign-off Jul 2015 | 2071 29th Av | remodel kitchen, (2) bathrooms, replace bedroom interior finishes with 5/8" type "x" gyp bd. no walls to remove ;no structural workDetails
remodel kitchen, (2) bathrooms, replace bedroom interior finishes with 5/8" type "x" gyp bd. no walls to remove ;no structural work | $32,600 |
| Feb 19, 2014 | Never finaled issued Feb 2014, no final | 2154 20th Av | remodel kitchen, (3) bathrooms & replace interior finishes w/5/8" tup x gtp bd at 2nd flr replace sheet rock on 2nd floor not to exceed 50% as needed it.Details
remodel kitchen, (3) bathrooms & replace interior finishes w/5/8" tup x gtp bd at 2nd flr replace sheet rock on 2nd floor not to exceed 50% as needed it. | $45,000 |
| Feb 1, 2013 | Completed final sign-off Jun 2013 | 1727 07th Av | remodel 2nd floor kitchen, relocate cabinets & appliance layout. add 1/2 bathroomDetails
remodel 2nd floor kitchen, relocate cabinets & appliance layout. add 1/2 bathroom | $20,000 |
| Nov 22, 2011 | Completed final sign-off May 2012 | 815 Victoria St | to remodel kitchen, add 2nd floor full bath in closet spaceand remove half bathDetails
to remodel kitchen, add 2nd floor full bath in closet spaceand remove half bath | $13,000 |
| Feb 2, 2009 | Completed final sign-off May 2009 | 1895 40th Av | remodel existing kitchenDetails
remodel existing kitchen | $20,000 |
| May 19, 2008 | Completed final sign-off Aug 2008 | 1271 16th Av | convert (e) bathroom and part of walk in closet into two separate bathrooms. existing closet of main bedroom to be converted to a linen closet. remodel (e) kitchen. all work on the 2nd floor.Details
convert (e) bathroom and part of walk in closet into two separate bathrooms. existing closet of main bedroom to be converted to a linen closet. remodel (e) kitchen. all work on the 2nd floor. | $30,000 |