Jihuan Ran Building Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Jun 2023
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
2 roof deck permits: 1 completed, 1 never finaled. Typically 490 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Jun 2026 | 756 Chestnut St | to comply w/ planning enf case # 2022-008982enf. revise int. wall demo calculations. remove portion of roof deck and glass guards to comply with setback regulations and revert back to previous approved condition. convert (e) storage at lvl 2 to (n) garage with (n) garage door, driveway and curb cut.Details
to comply w/ planning enf case # 2022-008982enf. revise int. wall demo calculations. remove portion of roof deck and glass guards to comply with setback regulations and revert back to previous approved condition. convert (e) storage at lvl 2 to (n) garage with (n) garage door, driveway and curb cut. | $2,000 |
| Aug 3, 2021 | Never finaled issued Sep 2021, no final | 312 Lombard St | 2/f (unit 312): remodel (e) bathroom & kitchen. add 1 full bathroom. 3/f (unit 312a): remodel (e) kitchen & bathroom and add spiral stairs to roof deck.Details
2/f (unit 312): remodel (e) bathroom & kitchen. add 1 full bathroom. 3/f (unit 312a): remodel (e) kitchen & bathroom and add spiral stairs to roof deck. | $120,000 |