Jihuan Ran Building Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2021 to Jun 2023
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 never finaled.
Of the 4 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 20, 2023 | Completed final sign-off Jun 2026 | 756 Chestnut St | to comply w/ planning enf case # 2022-008982enf. revise int. wall demo calculations. remove portion of roof deck and glass guards to comply with setback regulations and revert back to previous approved condition. convert (e) storage at lvl 2 to (n) garage with (n) garage door, driveway and curb cut.Details
to comply w/ planning enf case # 2022-008982enf. revise int. wall demo calculations. remove portion of roof deck and glass guards to comply with setback regulations and revert back to previous approved condition. convert (e) storage at lvl 2 to (n) garage with (n) garage door, driveway and curb cut. | $2,000 |
| Mar 25, 2022 | Never finaled issued Mar 2022, no final | 312 Lombard St | rev to pa202108035671: change roof hatch from swing to sliding.Details
rev to pa202108035671: change roof hatch from swing to sliding. | $2,000 |
| Nov 5, 2021 | Never finaled issued Nov 2021, no final | 312 Lombard St | replace 9 windows on lombard st side including 2 picture windows and 7 casement windows. wood clad aluminum frame to comply with complaint #202183783Details
replace 9 windows on lombard st side including 2 picture windows and 7 casement windows. wood clad aluminum frame to comply with complaint #202183783 | $5,000 |
| Sep 30, 2021 | Never finaled issued Nov 2021, no final | 312 Lombard St | revision of 2021 0803 5671 in 2nd fl: revise master bath and closet. in 3rd fl: revise kitchen, recess portion of living rm ceiling.Details
revision of 2021 0803 5671 in 2nd fl: revise master bath and closet. in 3rd fl: revise kitchen, recess portion of living rm ceiling. | $5,000 |
| Aug 3, 2021 | Never finaled issued Sep 2021, no final | 312 Lombard St | 2/f (unit 312): remodel (e) bathroom & kitchen. add 1 full bathroom. 3/f (unit 312a): remodel (e) kitchen & bathroom and add spiral stairs to roof deck.Details
2/f (unit 312): remodel (e) bathroom & kitchen. add 1 full bathroom. 3/f (unit 312a): remodel (e) kitchen & bathroom and add spiral stairs to roof deck. | $120,000 |
| Apr 21, 2021 | Completed final sign-off Oct 2021 | 85 Cleary Ct | kitchen and bath remodel.Details
kitchen and bath remodel. | $49,900 |