Back to kitchen remodel contractors
Jian Construction Company
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Mar 2026
- Last 24 months
- 2 permits filed
31 permits since 2000: 23 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 1 days from filing to permit and 199 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | Completed final sign-off Sep 2024 | 648 Sweeny St | kitchen remodel: removing old cabinets, faucet, sink, and replace w/ new. no moving walls.Details
kitchen remodel: removing old cabinets, faucet, sink, and replace w/ new. no moving walls. | $18,000 |
| Mar 14, 2023 | Completed final sign-off Jun 2023 | 313 02nd Av | apt #1: kitchen remodeling (1). no alteration of wall, window and door.Details
apt #1: kitchen remodeling (1). no alteration of wall, window and door. | $3,000 |
| Sep 20, 2022 | Completed final sign-off Feb 2023 | 2915 Yorba St | kitchen improvement cabinet replacement at 2nd floor. (e) walk-in closet converted to new master bathroom at 3rd floor.Details
kitchen improvement cabinet replacement at 2nd floor. (e) walk-in closet converted to new master bathroom at 3rd floor. | $25,000 |
| Nov 12, 2020 | Completed final sign-off Sep 2022 | 174 18th Av | replaceing plaster with sheetrock, remoodeling kitchens & bahtrooms on both units (#172-174). (no moving walls).Details
replaceing plaster with sheetrock, remoodeling kitchens & bahtrooms on both units (#172-174). (no moving walls). | $50,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2020 | 139 Denslowe Dr | kitchen remodel and add bathroom on 2nd fl. bathroom remodel on 1st fl.Details
kitchen remodel and add bathroom on 2nd fl. bathroom remodel on 1st fl. | $40,000 |
| Jun 20, 2018 | Never finaled issued Jun 2018, no final | 25 Cora St | interior remodel at 2nd fl only. relocate e kitchen to rear, new storage at e kitchen locationDetails
interior remodel at 2nd fl only. relocate e kitchen to rear, new storage at e kitchen location | $10,000 |
| Sep 26, 2017 | Completed final sign-off Jul 2018 | 44 Robblee Av | alteration including: new bedroom & bath in (e) unfurnished ground fl, remodeling (e) kitchen & bath on upper floor. new mechanical forced air heating & water heater & minor alteration to closet adjacent bath. new windows at rear.Details
alteration including: new bedroom & bath in (e) unfurnished ground fl, remodeling (e) kitchen & bath on upper floor. new mechanical forced air heating & water heater & minor alteration to closet adjacent bath. new windows at rear. | $150,000 |