Back to bathroom remodel contractors
Jian Construction Company
- Based in
- San Francisco
- On San Francisco permits
- May 2011 to Mar 2026
- Last 24 months
- 2 permits filed
31 permits since 2000: 23 completed, 1 in progress, 3 never finaled, 4 expired or cancelled.
Of the 3 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 6 completed, 2 expired or cancelled. Typically 41 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 31, 2024 | Completed final sign-off Jan 2025 | 6 Girard St | to comply w/ nov 202426913: remove ground fl wet bar & powder room. legalized ground fl full bathroom, replace 1 damaged postDetails
to comply w/ nov 202426913: remove ground fl wet bar & powder room. legalized ground fl full bathroom, replace 1 damaged post | $15,000 |
| Dec 30, 2022 | Expired or cancelled cancelled Jan 2026 | 1521 Burrows St | change tile and vanity cabinet. partial remodel of one bathroom.Details
change tile and vanity cabinet. partial remodel of one bathroom. | $3,000 |
| Sep 20, 2022 | Completed final sign-off Feb 2023 | 2915 Yorba St | kitchen improvement cabinet replacement at 2nd floor. (e) walk-in closet converted to new master bathroom at 3rd floor.Details
kitchen improvement cabinet replacement at 2nd floor. (e) walk-in closet converted to new master bathroom at 3rd floor. | $25,000 |
| Feb 10, 2021 | Completed final sign-off Sep 2022 | 174 18th Av | revision to no plan pa# 202011128699. add 1.5 bathroom + bedroom + family room + stairs on 1st floor. reconfigure 2nd fl + add half hathroom. reconfigure 3rd fl + add 1 bathroom + stairs to new roof deck.Details
revision to no plan pa# 202011128699. add 1.5 bathroom + bedroom + family room + stairs on 1st floor. reconfigure 2nd fl + add half hathroom. reconfigure 3rd fl + add 1 bathroom + stairs to new roof deck. | $270,000 |
| Dec 11, 2018 | Completed final sign-off Jun 2020 | 139 Denslowe Dr | kitchen remodel and add bathroom on 2nd fl. bathroom remodel on 1st fl.Details
kitchen remodel and add bathroom on 2nd fl. bathroom remodel on 1st fl. | $40,000 |
| Sep 26, 2017 | Completed final sign-off Jul 2018 | 44 Robblee Av | alteration including: new bedroom & bath in (e) unfurnished ground fl, remodeling (e) kitchen & bath on upper floor. new mechanical forced air heating & water heater & minor alteration to closet adjacent bath. new windows at rear.Details
alteration including: new bedroom & bath in (e) unfurnished ground fl, remodeling (e) kitchen & bath on upper floor. new mechanical forced air heating & water heater & minor alteration to closet adjacent bath. new windows at rear. | $150,000 |
| Aug 3, 2017 | Completed final sign-off Apr 2018 | 1431 26th Av | new: 2 bedrooms, 1 full bathroom, 1 toilet room and laundry room at ground floor. new rear deck and stair at 2nd floor.Details
new: 2 bedrooms, 1 full bathroom, 1 toilet room and laundry room at ground floor. new rear deck and stair at 2nd floor. | $50,000 |
| Jun 19, 2013 | Expired or cancelled expired Nov 2019 | 328 17th Av | rear addition including expansion of habitable space bath and fam room into existing first floor of bldg roofdeck over 1st floor addition, 2nd floor addition, 3rd floor expansion of sun room and (n) bathroom, no change to front facade or any portion visible from streetDetails
rear addition including expansion of habitable space bath and fam room into existing first floor of bldg roofdeck over 1st floor addition, 2nd floor addition, 3rd floor expansion of sun room and (n) bathroom, no change to front facade or any portion visible from street | $120,000 |