Jetton Construction
- Based in
- Berkeley
- On San Francisco permits
- Dec 2002 to Jul 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 24 completed, 3 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 never finaled. Typically 96 days from filing to permit and 584 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 8, 2021 | Completed final sign-off Jul 2022 | 12 Prospect Av | new exterior stair at rear per dcp 2020009204var. no new floor area, no change to building height or depthDetails
new exterior stair at rear per dcp 2020009204var. no new floor area, no change to building height or depth | $18,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2022 | 443 Lake St | 1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house.Details
1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house. | $105,000 |
| Aug 10, 2017 | Completed final sign-off Nov 2020 | 2511 Baker St | expansion of (e) basement (427 additional sq ft) with (n) media rm, bath & laundry & relocate internal stair. work includs (n) retaining wall & foundation.Details
expansion of (e) basement (427 additional sq ft) with (n) media rm, bath & laundry & relocate internal stair. work includs (n) retaining wall & foundation. | $450,000 |
| Jun 28, 2017 | Never finaled issued Apr 2018, no final | 65 Lippard Av | horizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation.Details
horizontal expansion @ all levels. addition of rooftop stair & elevator penthouse. renovate (e) deck, (n) windows & (n) openings. partial interior renovation. | $175,000 |
| Sep 30, 2016 | Never finaled issued Jan 2017, no final | 2051 Broadway | interior remodel of two dwelling units uncluding voluntary selective structural strengthening at garage (ground) level & new den & full bathroom. new stair connected to 2nd floor unit to ground floor. replace bedroom windows on 2nd & 3rd flr unit. kitchen & 2 bathrooms remodel on 2nd & 3rd flr unitsDetails
interior remodel of two dwelling units uncluding voluntary selective structural strengthening at garage (ground) level & new den & full bathroom. new stair connected to 2nd floor unit to ground floor. replace bedroom windows on 2nd & 3rd flr unit. kitchen & 2 bathrooms remodel on 2nd & 3rd flr units | $800,000 |