Back to kitchen remodel contractors
Jetton Construction
- Based in
- Berkeley
- On San Francisco permits
- Dec 2002 to Jul 2026
- Last 24 months
- 3 permits filed
35 permits since 2000: 24 completed, 3 in progress, 7 never finaled, 1 expired or cancelled.
Of the 7 never-finaled permits, 6 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
13 kitchen remodel permits: 8 completed, 1 in progress, 4 never finaled. Typically 15 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 31, 2026 | In progress issued Mar 2026 | 3124 Clay St | kitchen remodel, replace finishes, update electricalDetails
kitchen remodel, replace finishes, update electrical | $30,000 |
| Sep 13, 2023 | Completed final sign-off Apr 2025 | 1940 Vallejo St | unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinetsDetails
unit 9: interior remodel, no new structural load bearing walls, update kitchen, bathrooms & other w/new electrical/light fixtures, plumbing & mechanical, new fixtures & cabinets | $200,000 |
| Nov 30, 2020 | Completed final sign-off Nov 2022 | 443 Lake St | 1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house.Details
1/f: new gym,bedroom, bathroom, mudroom and laundry area with new stair to level 2. interior renovations to 2/f & 3/f including kitchen & power & bathroom & den,entry,living room,den,master. exterior work includes (n) garage door in (e) opening at front and new fenestration at rear & sides of house. | $105,000 |
| Apr 18, 2019 | Completed final sign-off Dec 2020 | 12 Prospect Av | interior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from streetDetails
interior renovation and partial roofing replacement; replace rear windows in kind; replace rear door; remodel existing kitchen & bathrooms replace fixtures. no alterations visible from street | $77,000 |
| Sep 13, 2017 | Never finaled issued Nov 2017, no final | 65 Lippard Av | revision to app#201507242421 to modify partition walls, add 2 new baths, renovate kitchen, pour conc. slabs and retaining wall at lower level.Details
revision to app#201507242421 to modify partition walls, add 2 new baths, renovate kitchen, pour conc. slabs and retaining wall at lower level. | $100,000 |
| Nov 22, 2016 | Never finaled issued Dec 2016, no final | 1150 Lombard St | interior renovation only. remodel kitchen including finishes, fixtures, lighting and plumbing. no additonal sq footage, no exterior workDetails
interior renovation only. remodel kitchen including finishes, fixtures, lighting and plumbing. no additonal sq footage, no exterior work | $92,000 |
| Sep 30, 2016 | Never finaled issued Jan 2017, no final | 2051 Broadway | interior remodel of two dwelling units uncluding voluntary selective structural strengthening at garage (ground) level & new den & full bathroom. new stair connected to 2nd floor unit to ground floor. replace bedroom windows on 2nd & 3rd flr unit. kitchen & 2 bathrooms remodel on 2nd & 3rd flr unitsDetails
interior remodel of two dwelling units uncluding voluntary selective structural strengthening at garage (ground) level & new den & full bathroom. new stair connected to 2nd floor unit to ground floor. replace bedroom windows on 2nd & 3rd flr unit. kitchen & 2 bathrooms remodel on 2nd & 3rd flr units | $800,000 |
| Jul 24, 2015 | Never finaled issued Aug 2015, no final | 65 Lippard Av | relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg.Details
relocate 1/f unit down to basement, expand upper unit down to 1/f, modify partition walls, add 2 bathrooms, remodel kitchens, replace windows, repair deck in kind, provide slab on grade @ basement & modify front of bldg. | $140,000 |
| Sep 9, 2013 | Completed final sign-off Aug 2014 | 346 Fair Oaks St | reroof siding replacement,sedect areas, repair front windws at req.,replace rear window with in kin, replace 3 beams lower sog, add bath, relocate kitchen, raise lower dlg. where shown. new hydronic floor heating, improve insulation,various trim, drywall improvement, new electrical and lighting.Details
reroof siding replacement,sedect areas, repair front windws at req.,replace rear window with in kin, replace 3 beams lower sog, add bath, relocate kitchen, raise lower dlg. where shown. new hydronic floor heating, improve insulation,various trim, drywall improvement, new electrical and lighting. | $650,000 |
| Mar 17, 2011 | Completed final sign-off Jun 2011 | 1101 Green St | unit# 602, 6th floor. kitchen and bathroom remodeling. change counter tops, plumbing fixtures, electrical fixtures and install new tilesDetails
unit# 602, 6th floor. kitchen and bathroom remodeling. change counter tops, plumbing fixtures, electrical fixtures and install new tiles | $12,500 |
| Oct 13, 2010 | Completed final sign-off Jan 2011 | 130 Delmar St | exterior siding repair in kind. approx 200 sq.ft. interior dry wall repair in kind. kitchen, bath & dining area, approx 150 sq.ft.Details
exterior siding repair in kind. approx 200 sq.ft. interior dry wall repair in kind. kitchen, bath & dining area, approx 150 sq.ft. | $10,500 |
| Jun 26, 2008 | Completed final sign-off Dec 2008 | 2400 Green St | kitchen remodel, new cabinets, electric, plumbing. new gas fireplace in living room.Details
kitchen remodel, new cabinets, electric, plumbing. new gas fireplace in living room. | $70,000 |
| Mar 7, 2003 | Completed final sign-off Apr 2003 | 2517 Pacific Av | install of c-channel at exist beam in kitchen as per engr direction revise to 983401,2002/12/13/3499Details
install of c-channel at exist beam in kitchen as per engr direction revise to 983401,2002/12/13/3499 | $1,000 |