Jesus Henriquez
- Based in
- El Sobrante
- On San Francisco permits
- Aug 2019 to Dec 2025
- Last 24 months
- 8 permits filed
24 permits since 2000: 11 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 3 in progress, 2 never finaled. Typically 72 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 13, 2025 | In progress issued Jul 2025 | 4663 Mission St | to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review.Details
to comply with nov 202182947. removal of non-permitted 2/f deck and stair down. replacement with smaller 2/f landing and stair down. no exit thru commercial per planning review. | $18,000 |
| Jan 9, 2025 | In progress issued May 2025 | 158 Flood Av | ground fl - add 2 bedrms, add 1 bathrm, media/gym room & laundry @ ground fl; 2nd fl - (e) kitchen to be renovated, relocate interior stairs to other side of house; improve the rear deck increasing 885 sf of conditioned spaceDetails
ground fl - add 2 bedrms, add 1 bathrm, media/gym room & laundry @ ground fl; 2nd fl - (e) kitchen to be renovated, relocate interior stairs to other side of house; improve the rear deck increasing 885 sf of conditioned space | $150,000 |
| Sep 24, 2024 | In progress issued Sep 2025 | 754 42nd Av | (n) rear deck and stairs; (n) door to rear deckDetails
(n) rear deck and stairs; (n) door to rear deck | $50,000 |
| May 28, 2021 | Never finaled filed May 2021, never issued | 1503 Dolores St | 1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration.Details
1)comply with nov 20205067 debating increase size of deck. 2)no deck work second floor. 3)first floor revised, bottom 4 steps are wider and configured the same,the next 3 steps will go in a straight line versus the original turn, therefor changing in configuration. | $2,500 |
| Aug 7, 2020 | Never finaled issued Aug 2020, no final | 1503 Dolores St | termite, fungus & dry rot repair to exterior decking area. the deck is 3 floors but work is only to ground level stars 11 out of 30 for repair. less than 50% of the decking & stairing structure. mainly 10 steps surface only, no structural work. all work in kind. not visible from street.Details
termite, fungus & dry rot repair to exterior decking area. the deck is 3 floors but work is only to ground level stars 11 out of 30 for repair. less than 50% of the decking & stairing structure. mainly 10 steps surface only, no structural work. all work in kind. not visible from street. | $1,000 |