Back to bathroom remodel contractors
Jesus Henriquez
- Based in
- El Sobrante
- On San Francisco permits
- Aug 2019 to Dec 2025
- Last 24 months
- 8 permits filed
24 permits since 2000: 11 completed, 6 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 2 are 3 to 5 years old, 3 are 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 34 days from filing to permit and 80 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 21, 2025 | Completed final sign-off Oct 2025 | 1646 42nd Av | kitchen remodel in kind: replace (e) cabinets, appliances, & fixtures- like for like. bathroom remodel in kind: replace (e) floor tile, shower tile, & fixtures- like for like. all work in-kind to match (e) location. no change to floor layout. no change to wall layout. no structural work.Details
kitchen remodel in kind: replace (e) cabinets, appliances, & fixtures- like for like. bathroom remodel in kind: replace (e) floor tile, shower tile, & fixtures- like for like. all work in-kind to match (e) location. no change to floor layout. no change to wall layout. no structural work. | $30,000 |
| May 3, 2024 | In progress issued Jul 2024 | 51 Ramona Av | remodel 2 kitchens, and 1 bathroom and 3 skylights.Details
remodel 2 kitchens, and 1 bathroom and 3 skylights. | $60,000 |
| Aug 7, 2019 | Completed final sign-off Nov 2019 | 235 Vasquez Av | convert (e) 2nd flr bathroom into 2 seperate bathrooms. plm/ele work as reqd. no structural work. no work at 1st flr or garage levelDetails
convert (e) 2nd flr bathroom into 2 seperate bathrooms. plm/ele work as reqd. no structural work. no work at 1st flr or garage level | $15,000 |