Back to kitchen remodel contractors
Jeff Mc Cord Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Mar 2002 to Mar 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 158 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 541 Hill St | full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade.Details
full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade. | $60,000 |
| Mar 2, 2015 | Completed final sign-off Jun 2015 | 541 Hill St | unit a: kitchen remodel, floor leveling, window replacement, install tankless hot water heater. window u-factor=0.32 kitchen window replacement is not visible from street, kitchen remodel - non structural work only.Details
unit a: kitchen remodel, floor leveling, window replacement, install tankless hot water heater. window u-factor=0.32 kitchen window replacement is not visible from street, kitchen remodel - non structural work only. | $25,000 |
| Aug 20, 2014 | Never finaled issued Aug 2014, no final | 215 Lakeshore Dr | one kitchen remodel. replace cabinets and upgrade electrical. non structural.Details
one kitchen remodel. replace cabinets and upgrade electrical. non structural. | $20,000 |
| Mar 5, 2002 | Expired or cancelled expired Jul 2003 | 738 23rd Av | kitchen remodel. remove cabinets & sheetrock upgrade plumbing & electrical,install new cabinets & apDetails
kitchen remodel. remove cabinets & sheetrock upgrade plumbing & electrical,install new cabinets & ap | $28,000 |