Back to bathroom remodel contractors
Jeff Mc Cord Construction Co
- Based in
- Pacifica
- On San Francisco permits
- Mar 2002 to Mar 2026
- Last 24 months
- 1 permit filed
8 permits since 2000: 6 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 27 days from filing to permit and 223 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 20, 2018 | Completed final sign-off Apr 2019 | 541 Hill St | full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade.Details
full interior remodel of apartment unit. remove extg wall, new bathroom. install new electrical outlets, lighting, new kitchen remodel. new sliding door and window at rear. new rear deck 18" above grade. | $60,000 |
| Aug 29, 2013 | Completed final sign-off Apr 2014 | 345 Princeton St | remodel two existing bathrooms - no structural changes.Details
remodel two existing bathrooms - no structural changes. | $18,000 |