Back to kitchen remodel contractors
Jchugoboss Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to May 2026
- Last 24 months
- 3 permits filed
17 permits since 2000: 10 completed, 4 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 336 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 4, 2024 | Completed final sign-off Feb 2025 | 114 Byxbee St | kitchen remodeling in kind. bathroom remodeling in kind. rewiring all the electrical circuits. install all new light fixtures. reinstall existing water heater. replace furnace and less than 25' of ductwork in garage.Details
kitchen remodeling in kind. bathroom remodeling in kind. rewiring all the electrical circuits. install all new light fixtures. reinstall existing water heater. replace furnace and less than 25' of ductwork in garage. | $50,000 |
| Sep 25, 2023 | Never finaled issued Sep 2023, no final | 1525 Jackson St | apt #1: replace countertop for the kitchen. (e) cabinets, appliances, fixtures to remain.Details
apt #1: replace countertop for the kitchen. (e) cabinets, appliances, fixtures to remain. | $3,000 |
| Sep 22, 2023 | Expired or cancelled cancelled Sep 2023 | 467 07th Av | unit 1: replace countertop for the kitchen. (e) cabinets, appliances, fixtures to remain.Details
unit 1: replace countertop for the kitchen. (e) cabinets, appliances, fixtures to remain. | $3,000 |
| Jul 7, 2023 | Completed final sign-off Dec 2023 | 2525 23rd Av | revision to permit #202212218860. add 2nd kitchen at ground floor w/ sink and two burner stove. change kitchen layout @ 2nd floorDetails
revision to permit #202212218860. add 2nd kitchen at ground floor w/ sink and two burner stove. change kitchen layout @ 2nd floor | $50,888 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 2525 23rd Av | remodel (e) kitchen, bathroom. construct 1 new full bathroom & upgrade partial ceiling joists at 2/f.Details
remodel (e) kitchen, bathroom. construct 1 new full bathroom & upgrade partial ceiling joists at 2/f. | $62,000 |
| Jul 7, 2021 | Completed final sign-off Nov 2021 | 2303 Bryant St | remodel kitchen in-kindDetails
remodel kitchen in-kind | $15,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 2122 Sutter St | interior remodel at 2nd fl. remodel (e) kitchen & living room. relocate 1 bathroom. remodel 1 full bathoom & 1 half restroom. relocate 1 laundry room to have dining area. add & remodel closets in (e) bedrooms. replace side & rear windows.Details
interior remodel at 2nd fl. remodel (e) kitchen & living room. relocate 1 bathroom. remodel 1 full bathoom & 1 half restroom. relocate 1 laundry room to have dining area. add & remodel closets in (e) bedrooms. replace side & rear windows. | $80,000 |