Back to bathroom remodel contractors
Jchugoboss Construction Llc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2021 to Sep 2026
- Last 24 months
- 4 permits filed
18 permits since 2000: 10 completed, 5 in progress, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Where they worked
- Single-family 4
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
6 bathroom remodel permits: 5 completed, 1 in progress. Typically 6 days from filing to permit and 336 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2026 | In progress issued Oct 2026 | 319 Plymouth Av | 2/f - relocate & remodel (e) kitchen, remodel 1 full bath & add 1 full bath. closet modifications. repair south side of the exterior siding due to dry rot. 1st flr - add (1) (n) bedroom, media room, fr & kitchenette. relocate (e) furnace & w.h. renew (e) furnace. (e) ext stair to remainDetails
2/f - relocate & remodel (e) kitchen, remodel 1 full bath & add 1 full bath. closet modifications. repair south side of the exterior siding due to dry rot. 1st flr - add (1) (n) bedroom, media room, fr & kitchenette. relocate (e) furnace & w.h. renew (e) furnace. (e) ext stair to remain | $120,000 |
| Jun 4, 2024 | Completed final sign-off Sep 2024 | 431 Munich St | one bathroom remodel in kindDetails
one bathroom remodel in kind | $10,000 |
| Mar 4, 2024 | Completed final sign-off Feb 2025 | 114 Byxbee St | kitchen remodeling in kind. bathroom remodeling in kind. rewiring all the electrical circuits. install all new light fixtures. reinstall existing water heater. replace furnace and less than 25' of ductwork in garage.Details
kitchen remodeling in kind. bathroom remodeling in kind. rewiring all the electrical circuits. install all new light fixtures. reinstall existing water heater. replace furnace and less than 25' of ductwork in garage. | $50,000 |
| Dec 21, 2022 | Completed final sign-off Dec 2023 | 2525 23rd Av | remodel (e) kitchen, bathroom. construct 1 new full bathroom & upgrade partial ceiling joists at 2/f.Details
remodel (e) kitchen, bathroom. construct 1 new full bathroom & upgrade partial ceiling joists at 2/f. | $62,000 |
| May 31, 2022 | Completed final sign-off Jun 2022 | 729 15th Av | remodel 1 bathroom in kind at first floorDetails
remodel 1 bathroom in kind at first floor | $6,000 |
| Mar 23, 2021 | Completed final sign-off Jun 2022 | 2122 Sutter St | interior remodel at 2nd fl. remodel (e) kitchen & living room. relocate 1 bathroom. remodel 1 full bathoom & 1 half restroom. relocate 1 laundry room to have dining area. add & remodel closets in (e) bedrooms. replace side & rear windows.Details
interior remodel at 2nd fl. remodel (e) kitchen & living room. relocate 1 bathroom. remodel 1 full bathoom & 1 half restroom. relocate 1 laundry room to have dining area. add & remodel closets in (e) bedrooms. replace side & rear windows. | $80,000 |