Permit GraphShortlistSan Francisco building permits since 2000

Jb Builders

Contractor license
890465
State license record
Based in
San Francisco
On San Francisco permits
May 2007 to Jul 2026
Last 24 months
3 permits filed

39 permits since 2000: 36 completed, 1 in progress, 2 never finaled.

Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywideThis contractor’s finished permits

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.

Kitchen remodel permits

AllDeck 1Stairs 4Kitchen remodel 7Bathroom remodel 13

7 kitchen remodel permits: 7 completed. Typically 0 days from filing to permit and 99 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 22, 2025Completed
final sign-off Oct 2025
1045 York Stkitchen remodel like for like. in kind sink and cabinet replacement. new electrical circuits as required. new dishwasher and faucet.
Details
Permit
202507221343
Status
complete
Filed
Jul 22, 2025
Permit issued
Jul 22, 2025
Final sign-off
Oct 29, 2025
Declared cost
$18,000
Address
1045 York St

kitchen remodel like for like. in kind sink and cabinet replacement. new electrical circuits as required. new dishwasher and faucet.

Open the permit page

$18,000
Jun 20, 2023Completed
final sign-off Dec 2023
2850 Broderick Stkitchen and powder room remodel. replace like for like, in kind kitchen cabinets, countertops, floors. new recessed lighting. no structral, demo work
Details
Permit
202306200448
Status
complete
Filed
Jun 20, 2023
Permit issued
Jun 20, 2023
Final sign-off
Dec 28, 2023
Declared cost
$64,000
Address
2850 Broderick St

kitchen and powder room remodel. replace like for like, in kind kitchen cabinets, countertops, floors. new recessed lighting. no structral, demo work

Open the permit page

$64,000
May 12, 2017Completed
final sign-off Oct 2017
1101 Green Stwork in unit #503: remodel kitchene and bathroom: replace in-kind bathroom tub, sink and toilet (low-flow flush). replace kitchen cabinets. new electric cooktop, sink. upgrade electrical panel at common area. new sub panel inside unit. electrical and plumbing work at sink.
Details
Permit
201705126511
Status
complete
Filed
May 12, 2017
Permit issued
May 12, 2017
Final sign-off
Oct 30, 2017
Declared cost
$75,000
Address
1101 Green St

work in unit #503: remodel kitchene and bathroom: replace in-kind bathroom tub, sink and toilet (low-flow flush). replace kitchen cabinets. new electric cooktop, sink. upgrade electrical panel at common area. new sub panel inside unit. electrical and plumbing work at sink.

Open the permit page

$75,000
Jan 19, 2017Completed
final sign-off Apr 2017
4026 Folsom Streplace in kind bathroom at kitchen level. new plumbing and electrical ; no change from present use.
Details
Permit
201701197440
Status
complete
Filed
Jan 19, 2017
Permit issued
Jan 19, 2017
Final sign-off
Apr 6, 2017
Declared cost
$18,000
Address
4026 Folsom St

replace in kind bathroom at kitchen level. new plumbing and electrical ; no change from present use.

Open the permit page

$18,000
Jun 3, 2015Completed
final sign-off Sep 2015
1425 Vallejo Stkitchen remodel, replace in-kind. new ckts for appliances as neccessary. new recessed lighting, hardwired co2 detectors already in place. sink remains in same location.
Details
Permit
201506037994
Status
complete
Filed
Jun 3, 2015
Permit issued
Jun 3, 2015
Final sign-off
Sep 10, 2015
Declared cost
$36,000
Address
1425 Vallejo St

kitchen remodel, replace in-kind. new ckts for appliances as neccessary. new recessed lighting, hardwired co2 detectors already in place. sink remains in same location.

Open the permit page

$36,000
Mar 2, 2015Completed
final sign-off Apr 2015
132 Faith Strepair to subfloor at various areas in the unit; replace as necessary; reduce (e) openings at bedroom from 125" to 84" for french door; minor elec. to remove ; add floor plugs and put back (e) kitchen sink after flooring done. comply with compliant 201529841; no structural work.
Details
Permit
201503029756
Status
complete
Filed
Mar 2, 2015
Permit issued
Mar 2, 2015
Final sign-off
Apr 21, 2015
Declared cost
$2,000
Address
132 Faith St

repair to subfloor at various areas in the unit; replace as necessary; reduce (e) openings at bedroom from 125" to 84" for french door; minor elec. to remove ; add floor plugs and put back (e) kitchen sink after flooring done. comply with compliant 201529841; no structural work.

Open the permit page

$2,000
Apr 24, 2013Completed
final sign-off Jul 2013
488 15th Avkitchen remodel/replace in kind (n) cabinets (n) electrical circuits included gfi plugs at countertops & for each appliance. recessed lights. ligting shall comply with title 24
Details
Permit
201304245375
Status
complete
Filed
Apr 24, 2013
Permit issued
Apr 24, 2013
Final sign-off
Jul 10, 2013
Declared cost
$16,000
Address
488 15th Av

kitchen remodel/replace in kind (n) cabinets (n) electrical circuits included gfi plugs at countertops & for each appliance. recessed lights. ligting shall comply with title 24

Open the permit page

$16,000