Back to bathroom remodel contractors
Jb Builders
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jul 2026
- Last 24 months
- 3 permits filed
39 permits since 2000: 36 completed, 1 in progress, 2 never finaled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 98 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 22, 2026 | In progress issued Jul 2026 | 1583 Funston Av | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $31,200 |
| Jan 11, 2022 | Completed final sign-off Jun 2022 | 1000 Vallejo St | two bathrooms remodel, like for like, replace in kind. no change to floor plan. retile showers, replace vinyl flooring, replace one vanity. no electric work.Details
two bathrooms remodel, like for like, replace in kind. no change to floor plan. retile showers, replace vinyl flooring, replace one vanity. no electric work. | $39,500 |
| Jan 11, 2022 | Completed final sign-off Apr 2022 | 3660 Washington St | bathroom remodel, like for like, replace in kind. no electric work. retile shower and new countertop. replace vinyl flooring. no change to layout of floor plan.Details
bathroom remodel, like for like, replace in kind. no electric work. retile shower and new countertop. replace vinyl flooring. no change to layout of floor plan. | $19,000 |
| Jan 28, 2019 | Completed final sign-off Mar 2019 | 488 15th Av | bathroom remodel. replace in kind. all fixtures. low flow toilet. elec and plumbing as required. windows @ tub and w/c replaced w/ safety glass vinyl windows. u-factor .30. perpendicula to p.l. @ lightwell. not visible to street.Details
bathroom remodel. replace in kind. all fixtures. low flow toilet. elec and plumbing as required. windows @ tub and w/c replaced w/ safety glass vinyl windows. u-factor .30. perpendicula to p.l. @ lightwell. not visible to street. | $16,800 |
| Oct 16, 2017 | Completed final sign-off Feb 2018 | 1101 Green St | unit 202: bathroom remodel, replace in-kind; plumbing locations remain, electric work per codes, new tile/paint, like-for-like.Details
unit 202: bathroom remodel, replace in-kind; plumbing locations remain, electric work per codes, new tile/paint, like-for-like. | $30,000 |
| May 12, 2017 | Completed final sign-off Oct 2017 | 1101 Green St | work in unit #503: remodel kitchene and bathroom: replace in-kind bathroom tub, sink and toilet (low-flow flush). replace kitchen cabinets. new electric cooktop, sink. upgrade electrical panel at common area. new sub panel inside unit. electrical and plumbing work at sink.Details
work in unit #503: remodel kitchene and bathroom: replace in-kind bathroom tub, sink and toilet (low-flow flush). replace kitchen cabinets. new electric cooktop, sink. upgrade electrical panel at common area. new sub panel inside unit. electrical and plumbing work at sink. | $75,000 |
| Jan 19, 2017 | Completed final sign-off Apr 2017 | 4026 Folsom St | replace in kind bathroom at kitchen level. new plumbing and electrical ; no change from present use.Details
replace in kind bathroom at kitchen level. new plumbing and electrical ; no change from present use. | $18,000 |
| Apr 21, 2014 | Completed final sign-off Jun 2014 | 419 Fulton St | remodel 2 bathrooms. replace tub/shower in bathroom. change tub to walk in shoer in other. no electrical work. each bath is approx 6'x10'. scope of work limited to tub/shower walls & floors. no work at sinks/ceilings or other walls.Details
remodel 2 bathrooms. replace tub/shower in bathroom. change tub to walk in shoer in other. no electrical work. each bath is approx 6'x10'. scope of work limited to tub/shower walls & floors. no work at sinks/ceilings or other walls. | $30,000 |
| Feb 21, 2014 | Completed final sign-off Jun 2014 | 1425 Vallejo St | work in unit #303: replace in kind master bathroom. convert tub to shower, new toilet & lavatory to replace (e) in same location. new tile & paint. gfi plug at wet locations. no change to (e) walls. including (n)recessed lights in adjoining bedroom. lighting shall comply w/ cec 150(k)10.Details
work in unit #303: replace in kind master bathroom. convert tub to shower, new toilet & lavatory to replace (e) in same location. new tile & paint. gfi plug at wet locations. no change to (e) walls. including (n)recessed lights in adjoining bedroom. lighting shall comply w/ cec 150(k)10. | $28,000 |
| Feb 10, 2014 | Never finaled issued Feb 2014, no final | 95 Stoneyford Av | convert existing laundry room to full bath, electrical work & plumbing work included at basement levelDetails
convert existing laundry room to full bath, electrical work & plumbing work included at basement level | $20,000 |
| Feb 20, 2009 | Completed final sign-off May 2009 | 1276 California St | new concrete slab in basement with moisture collection pipes under vapor barrier to (n) catch basin. (e) bathroom remodeled in kind. no (n) lighting.Details
new concrete slab in basement with moisture collection pipes under vapor barrier to (n) catch basin. (e) bathroom remodeled in kind. no (n) lighting. | $32,000 |
| Jan 28, 2008 | Completed final sign-off Mar 2008 | 6115 California St | installation of 10" solatube daylighting system in bathroom ceiling. reference 200711289085, bath remodel. roof penetration no less than 5' from property line.Details
installation of 10" solatube daylighting system in bathroom ceiling. reference 200711289085, bath remodel. roof penetration no less than 5' from property line. | $500 |
| Nov 28, 2007 | Completed final sign-off Mar 2008 | 6115 California St | remodel 2nd fl. bathroom, new tub, sink, toilet, replace tile, upgrade plugs to gfi's.Details
remodel 2nd fl. bathroom, new tub, sink, toilet, replace tile, upgrade plugs to gfi's. | $20,000 |