Permit GraphShortlistSan Francisco building permits since 2000

Jaie Construction

Contractor license
888548
State license record
Based in
Daly City
On San Francisco permits
Oct 2013 to Jun 2025
Last 24 months
1 permit filed

10 permits since 2000: 8 completed, 1 in progress, 1 expired or cancelled.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllStairs 1Kitchen remodel 3Bathroom remodel 3

3 kitchen remodel permits: 2 completed, 1 expired or cancelled. Typically 173 days from filing to permit and 210 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Jun 25, 2025Completed
final sign-off Dec 2025
175 Seal Rock Dr1) kitchen remodel at top floor. 2) electrical upgrade by code. 3) plumbing. (all work top floor kitchen).
Details
Permit
202506259454
Status
complete
Filed
Jun 25, 2025
Permit issued
Jun 26, 2025
Final sign-off
Dec 10, 2025
Declared cost
$20,000
Address
175 Seal Rock Dr

1) kitchen remodel at top floor. 2) electrical upgrade by code. 3) plumbing. (all work top floor kitchen).

Open the permit page

$20,000
Nov 7, 2018Expired or cancelled
expired Nov 2023
632 London Staddition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691.
Details
Permit
201811075335
Status
expired
Filed
Nov 7, 2018
Permit issued
Mar 16, 2020
Declared cost
$40,000
Address
632 London St

addition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691.

Open the permit page

$40,000
May 12, 2016Completed
final sign-off Jul 2017
70 Regent Stbedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 na
Details
Permit
201605127240
Status
complete
Filed
May 12, 2016
Permit issued
Nov 1, 2016
Final sign-off
Jul 11, 2017
Declared cost
$30,000
Address
70 Regent St

bedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 na

Open the permit page

$30,000