Back to bathroom remodel contractors
Jaie Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2013 to Jun 2025
- Last 24 months
- 1 permit filed
10 permits since 2000: 8 completed, 1 in progress, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 expired or cancelled. Typically 336 days from filing to permit and 200 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2018 | Expired or cancelled expired Nov 2023 | 632 London St | addition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691.Details
addition of a living room, dining, kitchen and bedroom and a three fixture bathroom at the garage level per ordinance 162-16. remove interior stairs at both floors of building to create two separate units. to comply with nov #200725091 & #201486691. | $40,000 |
| May 12, 2016 | Completed final sign-off Jul 2017 | 70 Regent St | bedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 naDetails
bedroom addition to (e) unenclosed space at the rear. bathroom/kitchen renovation/upgrade upstairs. add bathroom @ garage level with plumbing connection. upgrade electrical panel. front facade window to be wood frame, same operation. keep original garage drive. maher ord 155-13 na | $30,000 |
| Oct 17, 2013 | Completed final sign-off Feb 2015 | 2621 San Jose Av | document and legalize new/as-built bathrooms. install new windows in bedrooms 4 and 5. new plumbing associated with new bathrooms.Details
document and legalize new/as-built bathrooms. install new windows in bedrooms 4 and 5. new plumbing associated with new bathrooms. | $20,000 |