Permit GraphShortlistSan Francisco building permits since 2000

Jaeb Innovations

Contractor license
672691
State license record
Based in
Half Moon Bay
On San Francisco permits
Jun 2010 to Apr 2012
Last 24 months
0 permits filed

4 permits since 2000: 2 completed, 2 never finaled.

Of the 2 never-finaled permits, 2 are over 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Kitchen remodel permits

AllKitchen remodel 1Bathroom remodel 1

1 kitchen remodel permit: 1 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Apr 15, 2011Never finaled
issued Apr 2011, no final
29 Cortland Avadding shower in 1 bath,repair dryrot in subfloor and tub enclosure of #2 bath/electrical main disconnect,grounding electroconductor,2 distribution panels,forced air heater, kitchen remodel.
Details
Permit
201104154139
Status
issued
Filed
Apr 15, 2011
Permit issued
Apr 15, 2011
Declared cost
$24,000
Address
29 Cortland Av

adding shower in 1 bath,repair dryrot in subfloor and tub enclosure of #2 bath/electrical main disconnect,grounding electroconductor,2 distribution panels,forced air heater, kitchen remodel.

Open the permit page

$24,000