Block 5673, lot 015
29 Cortland Av
The city’s assessor roll has no record for this parcel.
Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 13, 2016 | Completed final sign-off Jun 2016 | 29 Cortland Av | David Farren | repair rotten section of entry stairs, less than 50%. repair in kind.Details
repair rotten section of entry stairs, less than 50%. repair in kind. | $4,000 |
| Feb 25, 2015 | Never finaled issued Feb 2015, no final | 29 Cortland Av | street spaceDetails
street space | ||
| Jun 10, 2014 | Completed final sign-off Jun 2014 | 29 Cortland Av | building permit to comply with cc-7324Details
building permit to comply with cc-7324 | $500 | |
| May 30, 2014 | Never finaled issued May 2014, no final | 29 Cortland Av | M & L Construction | 6' height fence and 10' long in front of entrance to 29a cortland avenueDetails
6' height fence and 10' long in front of entrance to 29a cortland avenue | $1,200 |
| Jan 30, 2014 | Completed final sign-off Apr 2014 | 29 Cortland Av | repair and modify extg pressure treated deck behind house with 3 levels. the purpose of the work is in respond to the structural inspection for condo conversion per report #cc-7324.Details
repair and modify extg pressure treated deck behind house with 3 levels. the purpose of the work is in respond to the structural inspection for condo conversion per report #cc-7324. | $500 | |
| Dec 29, 2011 | Completed final sign-off Jan 2013 | 29 Cortland Av | Jaeb Innovations | dryrot repair and create engineered support of center span of 1st fl joist from garage/office slab to rear of bldg. 2'6"x10"x12" and 1 6"x10"x6" beam pt douglas fir from inside corner of garge footing under beam with reinforced steel #4 bar. 8 oc/ replaced shed roof and beam above utility rm on 1stDetails
dryrot repair and create engineered support of center span of 1st fl joist from garage/office slab to rear of bldg. 2'6"x10"x12" and 1 6"x10"x6" beam pt douglas fir from inside corner of garge footing under beam with reinforced steel #4 bar. 8 oc/ replaced shed roof and beam above utility rm on 1st | $6,000 |
| Apr 15, 2011 | Never finaled issued Apr 2011, no final | 29 Cortland Av | Jaeb Innovations | adding shower in 1 bath,repair dryrot in subfloor and tub enclosure of #2 bath/electrical main disconnect,grounding electroconductor,2 distribution panels,forced air heater, kitchen remodel.Details
adding shower in 1 bath,repair dryrot in subfloor and tub enclosure of #2 bath/electrical main disconnect,grounding electroconductor,2 distribution panels,forced air heater, kitchen remodel. | $24,000 |
| Jun 3, 2010 | Completed final sign-off Dec 2010 | 29 Cortland Av | Jaeb Innovations | unit #a:new forced air,new gasline :furnace, stove, range,dryer/wh & washer,new electrical distribution to dw/6 disposal,range, cw, dryer,micro,4 k tube,5 gfi cir furnace. replumb laundry tray & cloths wshg, kchn sink,wndw replacement.kchn 10'x10'. remodel include 7 light fixtures , new cabinets &Details
unit #a:new forced air,new gasline :furnace, stove, range,dryer/wh & washer,new electrical distribution to dw/6 disposal,range, cw, dryer,micro,4 k tube,5 gfi cir furnace. replumb laundry tray & cloths wshg, kchn sink,wndw replacement.kchn 10'x10'. remodel include 7 light fixtures , new cabinets & | $58,926 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.