Back to bathroom remodel contractors
Jack Strong Plumbing & Building Services
- Based in
- Petaluma
- On San Francisco permits
- Jun 2013 to Jan 2025
- Last 24 months
- 1 permit filed
31 permits since 2000: 13 completed, 17 never finaled, 1 expired or cancelled.
Of the 17 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 13 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 9 completed, 11 never finaled. Typically 0 days from filing to permit and 93 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2022 | Never finaled issued Sep 2022, no final | 1115 Gilman Av | kitchen and bathroom remodeling inside floors. in-kindDetails
kitchen and bathroom remodeling inside floors. in-kind | $50,000 |
| Feb 18, 2020 | Completed final sign-off Jul 2020 | 1767 Hayes St | remodel kitchen & bathroom. new fixtures.Details
remodel kitchen & bathroom. new fixtures. | $15,000 |
| Sep 11, 2019 | Completed final sign-off Jan 2020 | 3026 Laguna St | remodel two bathrooms. fixtures, install bath fan, install pre fab shower panDetails
remodel two bathrooms. fixtures, install bath fan, install pre fab shower pan | $6,500 |
| Jul 18, 2019 | Completed final sign-off Oct 2019 | 760 Geary St | unit 205: non-structural interior remodel. relocate extg kitchen. remodel extg bathroom. provide new bedroom.Details
unit 205: non-structural interior remodel. relocate extg kitchen. remodel extg bathroom. provide new bedroom. | $35,000 |
| Jul 17, 2019 | Completed final sign-off Jun 2020 | 550 09th Av | remodel garage level 1 bathroom. new shower stall replace all fixtures, bathroom and fixtures in same location. no walls to be removed.Details
remodel garage level 1 bathroom. new shower stall replace all fixtures, bathroom and fixtures in same location. no walls to be removed. | $12,000 |
| May 17, 2019 | Completed final sign-off Jul 2019 | 128 Pierce St | remodel bathroom in kind. new toilet, sink, shower. install new fan and lights.Details
remodel bathroom in kind. new toilet, sink, shower. install new fan and lights. | $15,000 |
| Feb 27, 2019 | Never finaled issued Feb 2019, no final | 2459 37th Av | bathroom cabinets & fixts. r/r kitchen, shower pan as needed. replace eletrical outlets & plumbing fixts. no walls opened or removed cosmetic only. no change of (e) floor plan.Details
bathroom cabinets & fixts. r/r kitchen, shower pan as needed. replace eletrical outlets & plumbing fixts. no walls opened or removed cosmetic only. no change of (e) floor plan. | $35,000 |
| Jun 6, 2016 | Never finaled issued Jun 2016, no final | 1300 Golden Gate Av | apt 403: replace kitchen cabinets, flooring & fixtures. paint unit, change out bathroom fixtures, tub & shower valve.Details
apt 403: replace kitchen cabinets, flooring & fixtures. paint unit, change out bathroom fixtures, tub & shower valve. | $28,000 |
| Dec 28, 2015 | Never finaled issued Dec 2015, no final | 735 Geary St | unit 204: remove and replace kitchen cabinets and flooring repair plumbing and electrical as needed. paint unit. replace bathroom fixtures, tuv, shower valve and tileDetails
unit 204: remove and replace kitchen cabinets and flooring repair plumbing and electrical as needed. paint unit. replace bathroom fixtures, tuv, shower valve and tile | $15,000 |
| Dec 14, 2015 | Never finaled issued Dec 2015, no final | 378 Golden Gate Av | unit 442: replace kitchen cabinets & flooring, faucets, angle stops, tub/shower valve, bathroom rixtures & flooring. repair plumbing hot/cold water supplies & drain as needed, replace electrical outlets, light fixtures & subpanel as needed; no walls to be removed or altered.Details
unit 442: replace kitchen cabinets & flooring, faucets, angle stops, tub/shower valve, bathroom rixtures & flooring. repair plumbing hot/cold water supplies & drain as needed, replace electrical outlets, light fixtures & subpanel as needed; no walls to be removed or altered. | $8,500 |
| Jun 10, 2015 | Completed final sign-off Sep 2015 | 1300 Golden Gate Av | unit 200 - remove and replae kitchen and bathroom cabinets and tile floors. replace bathtub & tub/shower valve. repair plumbing as needed. upgrade electrical as neededDetails
unit 200 - remove and replae kitchen and bathroom cabinets and tile floors. replace bathtub & tub/shower valve. repair plumbing as needed. upgrade electrical as needed | $22,000 |
| Jan 13, 2015 | Completed final sign-off Apr 2016 | 378 Golden Gate Av | unit 448: remove and replace kitchen cabinets, counters and tile floors. repair plumbing drains, vents and hot/cold water supplies in kitchen and bathroom as needed. no walls moved, removed or added. all layouts remain unchanged. compliance with maher ordinance no 155-13 not required.Details
unit 448: remove and replace kitchen cabinets, counters and tile floors. repair plumbing drains, vents and hot/cold water supplies in kitchen and bathroom as needed. no walls moved, removed or added. all layouts remain unchanged. compliance with maher ordinance no 155-13 not required. | $18,000 |
| Jun 2, 2014 | Completed final sign-off Aug 2014 | 805 Leavenworth St | #903. remove/replace kitchen cabinets, counter & faucet, tile floor, remove/replace bath tub, shower valve, toilet and sink tile floor. replace all light fixtures with high efficacy fixtures.Details
#903. remove/replace kitchen cabinets, counter & faucet, tile floor, remove/replace bath tub, shower valve, toilet and sink tile floor. replace all light fixtures with high efficacy fixtures. | $19,500 |
| Feb 11, 2014 | Never finaled issued Feb 2014, no final | 655 Kansas St | apt 301. remove and replace cabinets, counter tops and fixtures in kitchen, relocate sub-panel for electrical from closet into hallway, replace bath tub, tub/shower valve and all fixtures in bathroom. tile walls and floor in bathroom, replace all lighting fixtures high efficacy. no structural work.Details
apt 301. remove and replace cabinets, counter tops and fixtures in kitchen, relocate sub-panel for electrical from closet into hallway, replace bath tub, tub/shower valve and all fixtures in bathroom. tile walls and floor in bathroom, replace all lighting fixtures high efficacy. no structural work. | $22,000 |
| Feb 7, 2014 | Completed final sign-off Mar 2014 | 928 Sutter St | administrative permit only. no work to be performed. to show plans/drwgs of the (e) space that differs from plans made in year 2000. added bathroom only.Details
administrative permit only. no work to be performed. to show plans/drwgs of the (e) space that differs from plans made in year 2000. added bathroom only. | |
| Oct 16, 2013 | Never finaled issued Oct 2013, no final | 760 Geary St | apt #501 interior remodel: remove non-load bearing walls to relcoate kitchen. provide new bedroom, removdel (e) bath, replace one window in-kind at lightwell. electrical & plumbing work as necessary, replace lighting wiht high efficacy lighting.Details
apt #501 interior remodel: remove non-load bearing walls to relcoate kitchen. provide new bedroom, removdel (e) bath, replace one window in-kind at lightwell. electrical & plumbing work as necessary, replace lighting wiht high efficacy lighting. | $20,000 |
| Aug 13, 2013 | Never finaled issued Aug 2013, no final | 760 Geary St | #312: remodel studio to one bedroom, remodel (e) bathroom and relocate the (e)kitchen per plan.Details
#312: remodel studio to one bedroom, remodel (e) bathroom and relocate the (e)kitchen per plan. | $15,000 |
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 760 Geary St | work in unit 312: remove and replace kitchen cabinets and fixtures. remove and replace bathroom fixtures, faucets, toilet and tub. upgrade electrical to code. no lighting change.Details
work in unit 312: remove and replace kitchen cabinets and fixtures. remove and replace bathroom fixtures, faucets, toilet and tub. upgrade electrical to code. no lighting change. | $25,000 |
| Aug 5, 2013 | Never finaled issued Aug 2013, no final | 729 Jones St | work in unit 208: remove and replace kitchen cabinets & fixtures. remove and replace bathroom fixtures faucets, toilet and tub. upgrade electrical to code. lighting no change.Details
work in unit 208: remove and replace kitchen cabinets & fixtures. remove and replace bathroom fixtures faucets, toilet and tub. upgrade electrical to code. lighting no change. | $25,000 |
| Jun 21, 2013 | Never finaled issued Jun 2013, no final | 760 Geary St | unit #206: remove & replace kitchen cabinets and fixtures, remove and replace bathroom fixtures, faucets, toilet to comply with complaint 201309182Details
unit #206: remove & replace kitchen cabinets and fixtures, remove and replace bathroom fixtures, faucets, toilet to comply with complaint 201309182 | $12,000 |