Jack Chen Construction
- Based in
- Millbrae
- On San Francisco permits
- May 2004 to Apr 2022
- Last 24 months
- 0 permits filed
34 permits since 2000: 33 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2016 | Completed final sign-off Jul 2017 | 2227 15th Av | renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension.Details
renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension. | $100,000 |
| Feb 3, 2010 | Completed final sign-off Aug 2010 | 2130 26th Av | remodeling ground floor: add new bedroom, family, storage & bath at ground floor. relocate kitchen & interior stair. add new study room, new bath @ 2nd. floor as per plan.Details
remodeling ground floor: add new bedroom, family, storage & bath at ground floor. relocate kitchen & interior stair. add new study room, new bath @ 2nd. floor as per plan. | $40,000 |
| Jan 24, 2007 | Never finaled issued Jan 2007, no final | 148 21st Av | relocate (e) cottage unit 8" additional away from rear p.l. to maintain 24" clr btw p.l. and bdg face enclose stair. work required to conform to 24" distance shown under p.a #200411239993.Details
relocate (e) cottage unit 8" additional away from rear p.l. to maintain 24" clr btw p.l. and bdg face enclose stair. work required to conform to 24" distance shown under p.a #200411239993. | |
| Dec 1, 2004 | Completed final sign-off Dec 2004 | 1470 Valencia St | repair stairs at rear exterior stair to comply with nov for routine inspection, 200454795, <50%Details
repair stairs at rear exterior stair to comply with nov for routine inspection, 200454795, <50% | $1,500 |