Back to bathroom remodel contractors
Jack Chen Construction
- Based in
- Millbrae
- On San Francisco permits
- May 2004 to Apr 2022
- Last 24 months
- 0 permits filed
34 permits since 2000: 33 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 10 completed. Typically 0 days from filing to permit and 128 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 8, 2021 | Completed final sign-off Sep 2021 | 537 08th Av | apt#2: remodel 2 full bathrooms in kind. replace tiles, plumbing fixtures and light fixtures. reokace tubs & toilets. no change to layout. 3rd fl.Details
apt#2: remodel 2 full bathrooms in kind. replace tiles, plumbing fixtures and light fixtures. reokace tubs & toilets. no change to layout. 3rd fl. | $12,000 |
| May 18, 2016 | Completed final sign-off Jul 2017 | 2227 15th Av | renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension.Details
renovate of (e) interior space on lower level to include (n) family rm bath, bedroom, laundry room, less than 500 sq ft living area. windows/doors in area of construction. (n) skylight, upgrade (e) stairs (non-conf) between upper & lower levels. no horizontal or vertical extension. | $100,000 |
| May 10, 2016 | Completed final sign-off Jul 2016 | 355 27th Av | replace bathroom tiles, shower enclosure & floor only, no new fixture stops no mep.Details
replace bathroom tiles, shower enclosure & floor only, no new fixture stops no mep. | $5,000 |
| Jan 10, 2013 | Completed final sign-off Apr 2013 | 1427 34th Av | bathroom remodel replace tile & change plumbing fixture. relocate toilet w/ 24" clear & 30" min.Details
bathroom remodel replace tile & change plumbing fixture. relocate toilet w/ 24" clear & 30" min. | $9,000 |
| Jan 10, 2013 | Completed final sign-off May 2013 | 311 Lincoln Wy | replace bath tile and replace plumbing fixtures and unit 1, unite 2, on 2nd floors and unit 3, unit 4 on 3rd fl. replace existing window for 3 lightwells for unit 1, unit 2 on 2nd floor and 3, 4 on 3rd floor. minor fire damage repair to comply with nov 201262121Details
replace bath tile and replace plumbing fixtures and unit 1, unite 2, on 2nd floors and unit 3, unit 4 on 3rd fl. replace existing window for 3 lightwells for unit 1, unit 2 on 2nd floor and 3, 4 on 3rd floor. minor fire damage repair to comply with nov 201262121 | $10,000 |
| Feb 3, 2010 | Completed final sign-off Aug 2010 | 2130 26th Av | remodeling ground floor: add new bedroom, family, storage & bath at ground floor. relocate kitchen & interior stair. add new study room, new bath @ 2nd. floor as per plan.Details
remodeling ground floor: add new bedroom, family, storage & bath at ground floor. relocate kitchen & interior stair. add new study room, new bath @ 2nd. floor as per plan. | $40,000 |
| Sep 9, 2009 | Completed final sign-off Dec 2009 | 531 22nd Av | relocate (e) bathroom at 2nd. floor to enlarge study room, close (e) door and 2-windows at rear to 1-double door.Details
relocate (e) bathroom at 2nd. floor to enlarge study room, close (e) door and 2-windows at rear to 1-double door. | $3,000 |
| Jan 22, 2009 | Completed final sign-off Jul 2015 | 228 Sweeny St | rear and two floor vertical addition, ground floor 9'-10" rear addition, add one car garage, remodel bath, add social room, new 2nd and 3rd floor, 10' deck on 3rd floor.Details
rear and two floor vertical addition, ground floor 9'-10" rear addition, add one car garage, remodel bath, add social room, new 2nd and 3rd floor, 10' deck on 3rd floor. | $350,000 |
| Aug 7, 2006 | Completed final sign-off Dec 2006 | 1363 08th Av | remode (e) bathroom with new sink, tub, toilet and floor. on third floor plan. replacing windows in same location but smaller in sizee as per plans in the bathroomDetails
remode (e) bathroom with new sink, tub, toilet and floor. on third floor plan. replacing windows in same location but smaller in sizee as per plans in the bathroom | $10,000 |
| Dec 20, 2005 | Completed final sign-off Mar 2006 | 109 Denslowe Dr | replace tile and plumbing fixture in all bath roomDetails
replace tile and plumbing fixture in all bath room | $20,000 |