J Y Electrical Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Nov 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 38 completed, 13 never finaled, 2 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 29 days from filing to permit and 197 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 62 Natick St | add new master bedroom with bathroom, study room and storage at 1st floor. relocate existing stairway to connect 1st and 2nd floor. remodel (e) kitchen & bathroom at 2nd floor. replace windows at front and rearDetails
add new master bedroom with bathroom, study room and storage at 1st floor. relocate existing stairway to connect 1st and 2nd floor. remodel (e) kitchen & bathroom at 2nd floor. replace windows at front and rear | $50,000 |