Back to kitchen remodel contractors
J Y Electrical Construction Co Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2000 to Nov 2021
- Last 24 months
- 0 permits filed
53 permits since 2000: 38 completed, 13 never finaled, 2 expired or cancelled.
Of the 13 never-finaled permits, 4 are 5 to 10 years old, 9 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 11 completed, 3 never finaled. Typically 0 days from filing to permit and 125 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 2, 2021 | Completed final sign-off Mar 2022 | 4725 Irving St | unit #2. remodel (e) kitchen and bath. replace 2 vinyl windows facing to rear yard and 1 kitchen window at lightwell. not street facing. no wall change.Details
unit #2. remodel (e) kitchen and bath. replace 2 vinyl windows facing to rear yard and 1 kitchen window at lightwell. not street facing. no wall change. | $20,000 |
| Nov 20, 2020 | Completed final sign-off May 2021 | 1741 Balboa St | 1741: remodel e kitchen and replace e furnace. 1743: remodel e kitchen and bathDetails
1741: remodel e kitchen and replace e furnace. 1743: remodel e kitchen and bath | $36,000 |
| Jul 15, 2019 | Completed final sign-off Dec 2019 | 287 Stonecrest Dr | remodel (e) kitchen and 3 bathroom remodel, in-kindDetails
remodel (e) kitchen and 3 bathroom remodel, in-kind | $20,000 |
| Sep 26, 2018 | Never finaled issued Sep 2018, no final | 627 Grant Av | remodel (e) kitchen & two bathrooms at each unit. #627 & 629Details
remodel (e) kitchen & two bathrooms at each unit. #627 & 629 | $6,000 |
| Dec 30, 2016 | Never finaled issued Apr 2018, no final | 524 Monterey Bl | revision to appln #201610180617. erect (n) unit to (e) single family dwelling. (n) kitchen on 1st fl.Details
revision to appln #201610180617. erect (n) unit to (e) single family dwelling. (n) kitchen on 1st fl. | $6,000 |
| Sep 19, 2016 | Never finaled issued Sep 2016, no final | 524 Monterey Bl | remodel (e) kitchen and bathroom at 2nd floor. no alteration of wall, window and door.Details
remodel (e) kitchen and bathroom at 2nd floor. no alteration of wall, window and door. | $20,000 |
| May 27, 2015 | Completed final sign-off Jun 2015 | 524 Monterey Bl | remove illegal kitchen & bathroom and storage rooms at garage level.Details
remove illegal kitchen & bathroom and storage rooms at garage level. | $2,000 |
| Feb 23, 2015 | Completed final sign-off Apr 2015 | 769 Chestnut St | remodel kitchen and bathroom at 3/f'; to comply with cec150.0(k)3&5Details
remodel kitchen and bathroom at 3/f'; to comply with cec150.0(k)3&5 | $16,000 |
| Feb 5, 2015 | Completed final sign-off Feb 2015 | 62 Natick St | revision to appl #2014.0630.0154- add (n) skylight @ kitchen, replace window to glass door @ rear, replace glass door to window, existing brick foundation to remain.Details
revision to appl #2014.0630.0154- add (n) skylight @ kitchen, replace window to glass door @ rear, replace glass door to window, existing brick foundation to remain. | |
| Oct 23, 2014 | Completed final sign-off Feb 2015 | 312 18th Av | #1 & 3 - revision to 201410027959. relocate existing kitchen and add new bedroom at unit 1 and 3. replace e windows at lightwell. new balcony and door at lightwell for escape onlyDetails
#1 & 3 - revision to 201410027959. relocate existing kitchen and add new bedroom at unit 1 and 3. replace e windows at lightwell. new balcony and door at lightwell for escape only | $5,000 |
| Oct 2, 2014 | Completed final sign-off Feb 2015 | 312 18th Av | #1 & #3-kitchen & bathroom remodel, (n)electrical wiring & replace sheet rock 600 sf & insultation at unit #1 & #3. no new wall & no (e)wall relocation. lighting in bathroom & kitchen remodelling shall comply with cec 150(k)5 & 150(k)3 resp. all new sheetrock shall be min. 5/8" type x & to match (e)Details
#1 & #3-kitchen & bathroom remodel, (n)electrical wiring & replace sheet rock 600 sf & insultation at unit #1 & #3. no new wall & no (e)wall relocation. lighting in bathroom & kitchen remodelling shall comply with cec 150(k)5 & 150(k)3 resp. all new sheetrock shall be min. 5/8" type x & to match (e) | $30,000 |
| Jun 30, 2014 | Completed final sign-off Feb 2015 | 62 Natick St | add new master bedroom with bathroom, study room and storage at 1st floor. relocate existing stairway to connect 1st and 2nd floor. remodel (e) kitchen & bathroom at 2nd floor. replace windows at front and rearDetails
add new master bedroom with bathroom, study room and storage at 1st floor. relocate existing stairway to connect 1st and 2nd floor. remodel (e) kitchen & bathroom at 2nd floor. replace windows at front and rear | $50,000 |
| Apr 14, 2014 | Completed final sign-off Feb 2015 | 515 Silver Av | remodel kitchen and 1 bathroom.Details
remodel kitchen and 1 bathroom. | $18,000 |
| Sep 18, 2012 | Completed final sign-off Jan 2013 | 3844 19th Av | replace dry-rot wood and re-stucco outside wall at kitchen, living room and dinning room area. total 450 sq ft. less than 50% of work of stucco.Details
replace dry-rot wood and re-stucco outside wall at kitchen, living room and dinning room area. total 450 sq ft. less than 50% of work of stucco. | $10,000 |