J-T A C Corp
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2025
- Last 24 months
- 4 permits filed
73 permits since 2000: 50 completed, 3 in progress, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 138 days from filing to permit and 408 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 19, 2021 | Completed final sign-off Apr 2022 | 438 Shields St | 1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear.Details
1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear. | $80,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2016 | 430 Crestlake Dr | enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch.Details
enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch. | $160,000 |