J-T A C Corp
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2025
- Last 24 months
- 4 permits filed
73 permits since 2000: 50 completed, 3 in progress, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2025 | Completed final sign-off Nov 2025 | 3801 03rd St | unit #525: replace broken (e) front door. size 36" x 96". aluminum with glass. all door operations and hardware to be in compliance with chapter 11b-404.Details
unit #525: replace broken (e) front door. size 36" x 96". aluminum with glass. all door operations and hardware to be in compliance with chapter 11b-404. | $5,000 |
| Jun 9, 2025 | Completed final sign-off Jun 2025 | 518 Divisadero St | replace existing subpanel and gfci plugs in kind. add 5 gfci plugs. patch minor sheetrock from electrical work in kind. fix leaking faucet.Details
replace existing subpanel and gfci plugs in kind. add 5 gfci plugs. patch minor sheetrock from electrical work in kind. fix leaking faucet. | $7,500 |
| Apr 24, 2025 | Completed final sign-off Sep 2025 | 262 Minerva St | to obtain final inspection for work approved under pa#: 202106293392 all work is complete.Details
to obtain final inspection for work approved under pa#: 202106293392 all work is complete. | $36,000 |
| Apr 1, 2025 | Completed final sign-off Aug 2025 | 430 27th Av | unit #1 bathroom remodel. replace 2 shower pan and 2 toilet. new subpanel and rewire in kindDetails
unit #1 bathroom remodel. replace 2 shower pan and 2 toilet. new subpanel and rewire in kind | $15,000 |
| Aug 1, 2024 | Completed final sign-off Apr 2025 | 372 Moultrie St | revision to approved bpa# 202311201110: remodel 1/f and 2/f, move stairs to rear, and add bathroom to 1/f. to comply w/ nov# 202425574.Details
revision to approved bpa# 202311201110: remodel 1/f and 2/f, move stairs to rear, and add bathroom to 1/f. to comply w/ nov# 202425574. | |
| Jul 15, 2024 | Completed final sign-off Jul 2025 | 431 Arch St | remodel existing 2 bathroom on first floor. rewire 2 bedroom on first floor. rewire 2 bedroom on 1/f. in kindDetails
remodel existing 2 bathroom on first floor. rewire 2 bedroom on first floor. rewire 2 bedroom on 1/f. in kind | $50,000 |
| Jun 20, 2024 | In progress issued Jun 2024 | 153 Sickles Av | revision to 202405232851; on 153 sickles ave: replace window in bedroom and kitchen, one window in bedroom on front of building. on 155: replace one window in bedroom on front of building.Details
revision to 202405232851; on 153 sickles ave: replace window in bedroom and kitchen, one window in bedroom on front of building. on 155: replace one window in bedroom on front of building. | $5,000 |
| May 23, 2024 | In progress issued Jun 2024 | 153 Sickles Av | at 2nd floor and 3rd floor: convert extg living room into new bedrooms and new living room. demo extg fire place at 2nd and 3rd floor. remodel extg kitchen.Details
at 2nd floor and 3rd floor: convert extg living room into new bedrooms and new living room. demo extg fire place at 2nd and 3rd floor. remodel extg kitchen. | $68,000 |
| Apr 22, 2024 | In progress issued Apr 2024 | 153 Sickles Av | remodeling one kitchen. wiring all electrical upgrade main panel 200 amp. add 100 amp subpanel in unit 153 sickles ave.Details
remodeling one kitchen. wiring all electrical upgrade main panel 200 amp. add 100 amp subpanel in unit 153 sickles ave. | $45,000 |
| May 1, 2023 | Completed final sign-off Apr 2024 | 1926 Funston Av | remodel kitchen & 4.5 bathroom in kind. no wall layout changes. no floor layout changes. no structural work.Details
remodel kitchen & 4.5 bathroom in kind. no wall layout changes. no floor layout changes. no structural work. | $50,000 |
| May 10, 2022 | Completed final sign-off Mar 2023 | 532 Parker Av | to obtain final inspection for work approved under pa# 201903286527. all work is complete.Details
to obtain final inspection for work approved under pa# 201903286527. all work is complete. | |
| May 10, 2022 | Never finaled issued May 2022, no final | 530 Parker Av | recommencement and completion of work approved under pa# 201903286525.Details
recommencement and completion of work approved under pa# 201903286525. | $25,000 |
| Jan 4, 2022 | Completed final sign-off Aug 2022 | 168 Sylvan Dr | remodel 2 bathrooms & remodel 1 kitchen in-kind on 2nd flr. new subpanel & rewire. no structural.Details
remodel 2 bathrooms & remodel 1 kitchen in-kind on 2nd flr. new subpanel & rewire. no structural. | $45,000 |
| Dec 6, 2021 | Never finaled issued Dec 2021, no final | 260 Minerva St | re-roofing, replace roof flat roof torch down. (obtained in conjunction with bpa#202112063777 with roof work reference)Details
re-roofing, replace roof flat roof torch down. (obtained in conjunction with bpa#202112063777 with roof work reference) | $6,500 |
| Dec 6, 2021 | Never finaled issued Dec 2021, no final | 260 Minerva St | remodel bathroom due to leak from roof in kindDetails
remodel bathroom due to leak from roof in kind | $10,000 |
| Sep 27, 2021 | Expired or cancelled withdrawn Oct 2021 | 187 Putnam St | remodeling (e) 1st floor by adding 1 bedroom and 1 full bathroomDetails
remodeling (e) 1st floor by adding 1 bedroom and 1 full bathroom | $30,000 |
| Jun 29, 2021 | Expired or cancelled expired Sep 2024 | 262 Minerva St | remodeling 1 kitchen & 1 bathroom.Details
remodeling 1 kitchen & 1 bathroom. | $25,000 |
| Apr 29, 2021 | Completed final sign-off May 2021 | 187 Putnam St | remodel bathroom due to leak from roof (reroofing pa# 2021-0429-9543)Details
remodel bathroom due to leak from roof (reroofing pa# 2021-0429-9543) | $4,500 |
| Apr 29, 2021 | Completed final sign-off May 2021 | 187 Putnam St | reroofing (ref building permit pa# 2021-0429-9545)Details
reroofing (ref building permit pa# 2021-0429-9545) | $5,000 |
| Apr 21, 2021 | Completed final sign-off Sep 2021 | 518 Divisadero St | change of use from beauty salon to sandwich preparation & saleDetails
change of use from beauty salon to sandwich preparation & sale | |
| Jan 19, 2021 | Completed final sign-off Apr 2022 | 438 Shields St | 1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear.Details
1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear. | $80,000 |
| Mar 28, 2019 | Expired or cancelled expired Mar 2023 | 532 Parker Av | remodel kitchen and one bathroom. replace two windows on the front to match in fiberglass. replace 4 rear windows. change lighting.Details
remodel kitchen and one bathroom. replace two windows on the front to match in fiberglass. replace 4 rear windows. change lighting. | $55,000 |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 530 Parker Av | remodel kitchen and two bath room. replace 2 front windows to match with fiberglass. replace 6 rear windows. change lighting. replace garage door in kind.Details
remodel kitchen and two bath room. replace 2 front windows to match with fiberglass. replace 6 rear windows. change lighting. replace garage door in kind. | $65,000 |
| Mar 28, 2019 | Completed final sign-off Aug 2019 | 530 Parker Av | reroofingDetails
reroofing | $10,000 |
| Oct 31, 2016 | Expired or cancelled cancelled Feb 2024 | 70 Manzanita Av | unit legalization ord 43-14. legalize (e) tv room as kitchen creating full dwelling unit. includes install gas stove, refrigerator, kitchen sink, range hood.Details
unit legalization ord 43-14. legalize (e) tv room as kitchen creating full dwelling unit. includes install gas stove, refrigerator, kitchen sink, range hood. | $7,300 |
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 712 Vermont St | reroofingDetails
reroofing | $14,000 |
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 712 Vermont St | guest bath-remove sheetrock ceiling approx 40 sq ft. install r30 if need. replace dry rot if found. install mold & moist resistant sheet rock. finish with paint match existing. comply with nov # 201575661Details
guest bath-remove sheetrock ceiling approx 40 sq ft. install r30 if need. replace dry rot if found. install mold & moist resistant sheet rock. finish with paint match existing. comply with nov # 201575661 | $4,000 |
| Oct 17, 2014 | Completed final sign-off Mar 2015 | 7 Shore View Av | replace 16 windows on side and rear facades (visible from public right-of-way). project also includes repair of dry rot, insulation, floor latch and roof on the south side of building.Details
replace 16 windows on side and rear facades (visible from public right-of-way). project also includes repair of dry rot, insulation, floor latch and roof on the south side of building. | $28,000 |
| Oct 10, 2014 | Completed final sign-off Aug 2015 | 2645 El Camino Del Mar | to comply w/nov #201492951 - replace landscape retaining walls, replace wooden stairs w/conc. stairs, replace siding in the back of house due to damage & dryort. re-surface roof deck, flat deck replace railing.Details
to comply w/nov #201492951 - replace landscape retaining walls, replace wooden stairs w/conc. stairs, replace siding in the back of house due to damage & dryort. re-surface roof deck, flat deck replace railing. | $17,000 |
| Aug 19, 2014 | Completed final sign-off Oct 2014 | 4114 Judah St | repair approx 10' lineal exterior wall framing. remove (e) 300 sq. ft. tile, replace in kind tile. (wall tile). note: per field inspector's correction notice, no drawings are reqd. at this time.Details
repair approx 10' lineal exterior wall framing. remove (e) 300 sq. ft. tile, replace in kind tile. (wall tile). note: per field inspector's correction notice, no drawings are reqd. at this time. | $14,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2016 | 430 Crestlake Dr | enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch.Details
enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch. | $160,000 |
| Feb 21, 2012 | Completed final sign-off Nov 2012 | 1737 Sutter St | remove & replace existing kitchen cabinets & counter tops. re-install existing dishwasher, refrigerator, stove, oven & sink. no doors, walls, windows under this permit, comply with co alarm requirements.Details
remove & replace existing kitchen cabinets & counter tops. re-install existing dishwasher, refrigerator, stove, oven & sink. no doors, walls, windows under this permit, comply with co alarm requirements. | $15,000 |
| Sep 14, 2011 | Completed final sign-off Nov 2011 | 1822 34th Av | stucco repair in the front of the house. 1. remove crack existing stucco, replace dry rot if found. stucco finish match existing. approx 500 sq ft.Details
stucco repair in the front of the house. 1. remove crack existing stucco, replace dry rot if found. stucco finish match existing. approx 500 sq ft. | $16,000 |
| Aug 2, 2011 | Completed final sign-off Feb 2012 | 1737 Sutter St | unit #d: repl existing kitchen cabinets, counter top, reinstall existing dishwasher, refrigerator, new gas range & range hood, repl existing shower pan, toilet, vanity sink same locationDetails
unit #d: repl existing kitchen cabinets, counter top, reinstall existing dishwasher, refrigerator, new gas range & range hood, repl existing shower pan, toilet, vanity sink same location | $15,000 |
| Jun 17, 2011 | Completed final sign-off Jul 2011 | 529 Ortega St | to install 1x8 v grove beroino house red siding over existing exterior plywood at rear walls. approx 700 sq ft.Details
to install 1x8 v grove beroino house red siding over existing exterior plywood at rear walls. approx 700 sq ft. | $12,000 |
| Nov 3, 2010 | Completed final sign-off Sep 2011 | 126 Hale St | to comply w/nov #201067426: legalize ground floor rooms including 1 bedroom, 1/2 bath, 2 storage rooms & add laundry.Details
to comply w/nov #201067426: legalize ground floor rooms including 1 bedroom, 1/2 bath, 2 storage rooms & add laundry. | $35,000 |
| Aug 6, 2010 | Completed final sign-off Sep 2010 | 2734 40th Av | reroofingDetails
reroofing | $8,000 |
| Jan 20, 2010 | Completed final sign-off Jan 2011 | 1737 Sutter St | 1)to remove extg exterior damaged partial board siding front and back. 2)to install new 1x8 redwood cove siding.Details
1)to remove extg exterior damaged partial board siding front and back. 2)to install new 1x8 redwood cove siding. | $66,000 |
| May 21, 2009 | Completed final sign-off Jun 2009 | 763 44th Av | re-roofingDetails
re-roofing | $7,500 |
| May 11, 2009 | Completed final sign-off Jun 2009 | 4924 Anza St | reroofing.Details
reroofing. | $8,000 |
| Apr 8, 2009 | Completed final sign-off Dec 2009 | 426 07th Av | reroofingDetails
reroofing | $8,000 |
| Feb 12, 2009 | Completed final sign-off Mar 2009 | 967 Golden Gate Av | reroofing.Details
reroofing. | $8,000 |
| May 8, 2008 | Completed final sign-off Oct 2008 | 854 37th Av | remove & replace toilet in water closet same location. remove & replace bathtub, vanity, shower pan in same location. remove & replace kitchen cabinets, counter tops, install new kitchen sink, dishwasher, dosposal in same location. provide fluorescenet light per cec. no changes to structure underDetails
remove & replace toilet in water closet same location. remove & replace bathtub, vanity, shower pan in same location. remove & replace kitchen cabinets, counter tops, install new kitchen sink, dishwasher, dosposal in same location. provide fluorescenet light per cec. no changes to structure under | $45,000 |
| Sep 4, 2007 | Completed final sign-off Sep 2007 | 3001 Turk Bl | reroofing.Details
reroofing. | $7,000 |
| Jun 12, 2007 | Completed final sign-off Jan 2009 | 2738 40th Av | 2 story horizontal addition to rear of existing building as per plan.Details
2 story horizontal addition to rear of existing building as per plan. | $100,000 |
| Jan 10, 2007 | Completed final sign-off Jan 2007 | 211 Tara St | reroofingDetails
reroofing | $8,000 |
| Jan 13, 2006 | Completed final sign-off Mar 2006 | 1431 46th Av | reroofingDetails
reroofing | $4,000 |
| Jan 13, 2006 | Completed final sign-off May 2006 | 1465 46th Av | reroofingDetails
reroofing | $3,500 |
| Oct 28, 2005 | Completed final sign-off Mar 2006 | 2626 46th Av | garage floor remodel. install 1 family room, 1 bathroom, 1 storage room. 2nd floor remodel. remodel (e) bathroom & convert (e) shower to toilet room. relocate kitchen & create 1 office room. reroofing.Details
garage floor remodel. install 1 family room, 1 bathroom, 1 storage room. 2nd floor remodel. remodel (e) bathroom & convert (e) shower to toilet room. relocate kitchen & create 1 office room. reroofing. | $30,000 |
| Oct 6, 2005 | Completed final sign-off Nov 2005 | 2438 33rd Av | reroofingDetails
reroofing | $4,500 |
| Mar 4, 2005 | Completed final sign-off May 2005 | 1152 Plymouth Av | kitchen remodel. remove (e) cabinets & counter. install new cabinets & counter. install (e) stove,Details
kitchen remodel. remove (e) cabinets & counter. install new cabinets & counter. install (e) stove, | $20,000 |
| Nov 15, 2004 | Completed final sign-off Nov 2004 | 7 Hill Point Av | reroofingDetails
reroofing | $7,000 |
| Jul 12, 2004 | Completed final sign-off Oct 2004 | 534 07th Av | reroofingDetails
reroofing | $6,000 |
| Oct 14, 2003 | Completed final sign-off Feb 2004 | 415 Carl St | bathrm remodel; remove (e)bath tub, vanity sink,toilet,wall tile;install new copper hot & cold waterDetails
bathrm remodel; remove (e)bath tub, vanity sink,toilet,wall tile;install new copper hot & cold water | $6,000 |
| Jan 13, 2003 | Completed final sign-off Jan 2003 | 111 Marietta Dr | reroofingDetails
reroofing | $6,000 |
| Dec 9, 2002 | Never finaled issued Dec 2002, no final | 1475 40th Av | construct 1 family roo, 1 storage room, 1 bath at garage floor. reroofing, replace tar and gravelDetails
construct 1 family roo, 1 storage room, 1 bath at garage floor. reroofing, replace tar and gravel | $16,000 |
| Jun 19, 2002 | Completed final sign-off Sep 2002 | 2438 33rd Av | kitchen remodel - remove&install new kitchen cabinet, counter, sink, &dishwasher.Details
kitchen remodel - remove&install new kitchen cabinet, counter, sink, &dishwasher. | $10,000 |
| Jan 17, 2002 | Expired or cancelled expired Jan 2003 | 330 05th Av | reroofingDetails
reroofing | |
| Sep 27, 2001 | Expired or cancelled expired Jan 2002 | 22 Hillway Av | reroofingDetails
reroofing | $5,000 |
| Sep 27, 2001 | Expired or cancelled expired Jan 2002 | 28 Hillway Av | reroofingDetails
reroofing | $5,000 |
| Sep 27, 2001 | Expired or cancelled expired Jan 2002 | 21 Hill Point Av | reroofingDetails
reroofing | $5,000 |
| Sep 27, 2001 | Expired or cancelled expired Jan 2002 | 34 Hillway Av | reroofingDetails
reroofing | $5,000 |
| Sep 5, 2001 | Expired or cancelled expired Jan 2002 | 608 Niagara Av | reroofingDetails
reroofing | $4,000 |
| Mar 9, 2001 | Completed final sign-off Jun 2001 | 2534 40th Av | remodel bathrm @ 2nd flDetails
remodel bathrm @ 2nd fl | $6,000 |
| Feb 26, 2001 | Expired or cancelled expired Dec 2001 | 57 Santa Rita Av | reroofingDetails
reroofing | $5,000 |
| Nov 16, 2000 | Expired or cancelled expired Mar 2001 | 1 Hill Point Av | reroofingDetails
reroofing | $4,000 |
| Nov 16, 2000 | Expired or cancelled expired May 2001 | 443 Carl St | reroofing remove ex tar/grvl to roof plank instl 1 layer 28lbs fbrgls base sheet instl 1 layr dibitnDetails
reroofing remove ex tar/grvl to roof plank instl 1 layer 28lbs fbrgls base sheet instl 1 layr dibitn | $9,000 |
| Sep 25, 2000 | Completed final sign-off Nov 2000 | 2 Hill Point Av | revision refer permit appn. 200008036924(full bath remain same location)Details
revision refer permit appn. 200008036924(full bath remain same location) | $4,000 |
| Aug 3, 2000 | Expired or cancelled expired Feb 2001 | 2 Hill Point Av | bathrm alterations-remove existng closet, three-quarter bath & partition walls, add partn walls & inDetails
bathrm alterations-remove existng closet, three-quarter bath & partition walls, add partn walls & in | $15,000 |
| Jun 23, 2000 | Completed final sign-off Aug 2001 | 2438 33rd Av | horizontal addition and vertical additionDetails
horizontal addition and vertical addition | $45,000 |
| Jun 2, 2000 | Completed final sign-off Aug 2000 | 2534 40th Av | rev. to pa#2000/04/13/7227-relocate bath from se corner to sw corner of family roomDetails
rev. to pa#2000/04/13/7227-relocate bath from se corner to sw corner of family room | |
| Apr 13, 2000 | Completed final sign-off Aug 2000 | 2534 40th Av | familyrm ground fl kitchen remodel, etc.Details
familyrm ground fl kitchen remodel, etc. | $35,000 |
| Mar 28, 2000 | Expired or cancelled expired Jul 2000 | 212 Tara St | reroofingDetails
reroofing | $2,400 |