Back to bathroom remodel contractors
J-T A C Corp
- Based in
- San Francisco
- On San Francisco permits
- Mar 2000 to Aug 2025
- Last 24 months
- 4 permits filed
73 permits since 2000: 50 completed, 3 in progress, 5 never finaled, 15 expired or cancelled.
Of the 5 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 14 completed, 3 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2025 | Completed final sign-off Aug 2025 | 430 27th Av | unit #1 bathroom remodel. replace 2 shower pan and 2 toilet. new subpanel and rewire in kindDetails
unit #1 bathroom remodel. replace 2 shower pan and 2 toilet. new subpanel and rewire in kind | $15,000 |
| Aug 1, 2024 | Completed final sign-off Apr 2025 | 372 Moultrie St | revision to approved bpa# 202311201110: remodel 1/f and 2/f, move stairs to rear, and add bathroom to 1/f. to comply w/ nov# 202425574.Details
revision to approved bpa# 202311201110: remodel 1/f and 2/f, move stairs to rear, and add bathroom to 1/f. to comply w/ nov# 202425574. | |
| Jul 15, 2024 | Completed final sign-off Jul 2025 | 431 Arch St | remodel existing 2 bathroom on first floor. rewire 2 bedroom on first floor. rewire 2 bedroom on 1/f. in kindDetails
remodel existing 2 bathroom on first floor. rewire 2 bedroom on first floor. rewire 2 bedroom on 1/f. in kind | $50,000 |
| May 1, 2023 | Completed final sign-off Apr 2024 | 1926 Funston Av | remodel kitchen & 4.5 bathroom in kind. no wall layout changes. no floor layout changes. no structural work.Details
remodel kitchen & 4.5 bathroom in kind. no wall layout changes. no floor layout changes. no structural work. | $50,000 |
| Jan 4, 2022 | Completed final sign-off Aug 2022 | 168 Sylvan Dr | remodel 2 bathrooms & remodel 1 kitchen in-kind on 2nd flr. new subpanel & rewire. no structural.Details
remodel 2 bathrooms & remodel 1 kitchen in-kind on 2nd flr. new subpanel & rewire. no structural. | $45,000 |
| Dec 6, 2021 | Never finaled issued Dec 2021, no final | 260 Minerva St | remodel bathroom due to leak from roof in kindDetails
remodel bathroom due to leak from roof in kind | $10,000 |
| Sep 27, 2021 | Expired or cancelled withdrawn Oct 2021 | 187 Putnam St | remodeling (e) 1st floor by adding 1 bedroom and 1 full bathroomDetails
remodeling (e) 1st floor by adding 1 bedroom and 1 full bathroom | $30,000 |
| Jun 29, 2021 | Expired or cancelled expired Sep 2024 | 262 Minerva St | remodeling 1 kitchen & 1 bathroom.Details
remodeling 1 kitchen & 1 bathroom. | $25,000 |
| Apr 29, 2021 | Completed final sign-off May 2021 | 187 Putnam St | remodel bathroom due to leak from roof (reroofing pa# 2021-0429-9543)Details
remodel bathroom due to leak from roof (reroofing pa# 2021-0429-9543) | $4,500 |
| Jan 19, 2021 | Completed final sign-off Apr 2022 | 438 Shields St | 1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear.Details
1/f: add 1 bedroom, 1 full bathroom and office. 2/f: remodel ktiche nand bathroom. new deck at rear. | $80,000 |
| Mar 28, 2019 | Expired or cancelled expired Mar 2023 | 532 Parker Av | remodel kitchen and one bathroom. replace two windows on the front to match in fiberglass. replace 4 rear windows. change lighting.Details
remodel kitchen and one bathroom. replace two windows on the front to match in fiberglass. replace 4 rear windows. change lighting. | $55,000 |
| Mar 28, 2019 | Never finaled issued Mar 2019, no final | 530 Parker Av | remodel kitchen and two bath room. replace 2 front windows to match with fiberglass. replace 6 rear windows. change lighting. replace garage door in kind.Details
remodel kitchen and two bath room. replace 2 front windows to match with fiberglass. replace 6 rear windows. change lighting. replace garage door in kind. | $65,000 |
| Nov 25, 2015 | Completed final sign-off Jun 2016 | 712 Vermont St | guest bath-remove sheetrock ceiling approx 40 sq ft. install r30 if need. replace dry rot if found. install mold & moist resistant sheet rock. finish with paint match existing. comply with nov # 201575661Details
guest bath-remove sheetrock ceiling approx 40 sq ft. install r30 if need. replace dry rot if found. install mold & moist resistant sheet rock. finish with paint match existing. comply with nov # 201575661 | $4,000 |
| Jun 30, 2014 | Completed final sign-off Apr 2016 | 430 Crestlake Dr | enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch.Details
enclose (e) elevated deck and expand interior living space, and bathroom. remodel kitchen and reconfigure doors to be wheelchair accessible. add wheelchair accessible ramp to entry porch. | $160,000 |
| Nov 3, 2010 | Completed final sign-off Sep 2011 | 126 Hale St | to comply w/nov #201067426: legalize ground floor rooms including 1 bedroom, 1/2 bath, 2 storage rooms & add laundry.Details
to comply w/nov #201067426: legalize ground floor rooms including 1 bedroom, 1/2 bath, 2 storage rooms & add laundry. | $35,000 |
| Oct 28, 2005 | Completed final sign-off Mar 2006 | 2626 46th Av | garage floor remodel. install 1 family room, 1 bathroom, 1 storage room. 2nd floor remodel. remodel (e) bathroom & convert (e) shower to toilet room. relocate kitchen & create 1 office room. reroofing.Details
garage floor remodel. install 1 family room, 1 bathroom, 1 storage room. 2nd floor remodel. remodel (e) bathroom & convert (e) shower to toilet room. relocate kitchen & create 1 office room. reroofing. | $30,000 |
| Oct 14, 2003 | Completed final sign-off Feb 2004 | 415 Carl St | bathrm remodel; remove (e)bath tub, vanity sink,toilet,wall tile;install new copper hot & cold waterDetails
bathrm remodel; remove (e)bath tub, vanity sink,toilet,wall tile;install new copper hot & cold water | $6,000 |
| Dec 9, 2002 | Never finaled issued Dec 2002, no final | 1475 40th Av | construct 1 family roo, 1 storage room, 1 bath at garage floor. reroofing, replace tar and gravelDetails
construct 1 family roo, 1 storage room, 1 bath at garage floor. reroofing, replace tar and gravel | $16,000 |
| Sep 25, 2000 | Completed final sign-off Nov 2000 | 2 Hill Point Av | revision refer permit appn. 200008036924(full bath remain same location)Details
revision refer permit appn. 200008036924(full bath remain same location) | $4,000 |
| Aug 3, 2000 | Expired or cancelled expired Feb 2001 | 2 Hill Point Av | bathrm alterations-remove existng closet, three-quarter bath & partition walls, add partn walls & inDetails
bathrm alterations-remove existng closet, three-quarter bath & partition walls, add partn walls & in | $15,000 |
| Jun 2, 2000 | Completed final sign-off Aug 2000 | 2534 40th Av | rev. to pa#2000/04/13/7227-relocate bath from se corner to sw corner of family roomDetails
rev. to pa#2000/04/13/7227-relocate bath from se corner to sw corner of family room |