Back to kitchen remodel contractors
J S Modern Construction Inc
- Based in
- Daly City
- On San Francisco permits
- Oct 2014 to Jan 2019
- Last 24 months
- 0 permits filed
15 permits since 2000: 12 completed, 3 never finaled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
6 kitchen remodel permits: 6 completed. Typically 0 days from filing to permit and 120 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 30, 2019 | Completed final sign-off Jun 2019 | 135 04th St | #4534: t.i. demolish (e) cashier counter and install (n) cashier counter, install modify electrical (power) lines (no lighting) install (n) kitchen equipmentDetails
#4534: t.i. demolish (e) cashier counter and install (n) cashier counter, install modify electrical (power) lines (no lighting) install (n) kitchen equipment | $15,000 |
| Nov 17, 2017 | Completed final sign-off Jan 2018 | 628 Congo St | kitchen remodel, in kind. replace cabinets, countertops, sink. all work at 2nd floor.Details
kitchen remodel, in kind. replace cabinets, countertops, sink. all work at 2nd floor. | $28,000 |
| Jul 18, 2017 | Completed final sign-off Nov 2017 | 444 Scott St | kitchen & bathroom remodel, replace cabinets, countertops, relocate bath tub and toilet. all work at 2/f.Details
kitchen & bathroom remodel, replace cabinets, countertops, relocate bath tub and toilet. all work at 2/f. | $30,000 |
| Jun 29, 2017 | Completed final sign-off Oct 2017 | 1835 25th Av | kitchen remodel, all work at 2/f, replace cabinets, countertops, install wall tiles and recessed lights. all high efficacy lighting. no change in wall & opening layout.Details
kitchen remodel, all work at 2/f, replace cabinets, countertops, install wall tiles and recessed lights. all high efficacy lighting. no change in wall & opening layout. | $35,000 |
| Jun 30, 2015 | Completed final sign-off Dec 2015 | 1686 35th Av | kitchen remodel: replace cabinets, counter tops, & sink, add recessed light. no walls moved, removed/added. all (e) layouts to remain unchanged.Details
kitchen remodel: replace cabinets, counter tops, & sink, add recessed light. no walls moved, removed/added. all (e) layouts to remain unchanged. | $8,000 |
| Oct 28, 2014 | Completed final sign-off Sep 2015 | 620 22nd Av | remodel extg kitchen and bath room at 3rd floor. replace counter. cabinets and plumbing fixtures.Details
remodel extg kitchen and bath room at 3rd floor. replace counter. cabinets and plumbing fixtures. | $18,000 |