Back to kitchen remodel contractors
J R G Construction
- Based in
- Pacifica
- On San Francisco permits
- Nov 2007 to Feb 2026
- Last 24 months
- 1 permit filed
30 permits since 2000: 26 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 145 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2020 | Completed final sign-off Sep 2020 | 60 Mangels Av | full remodel of the 2nd fl replacing all windows, full kitchen remodel & bathroom remodel as shown on plans. all windows to remain the same sized locationDetails
full remodel of the 2nd fl replacing all windows, full kitchen remodel & bathroom remodel as shown on plans. all windows to remain the same sized location | $110,000 |
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 640 Davis St | one kitchen & one bath remodelling. replace kitchen electric stove w/ gas stove. no change in lay out & opening. all new cabinets in same location. move the gas line to the stove location. all led lighting.Details
one kitchen & one bath remodelling. replace kitchen electric stove w/ gas stove. no change in lay out & opening. all new cabinets in same location. move the gas line to the stove location. all led lighting. | $20,000 |
| Mar 6, 2013 | Completed final sign-off Jun 2013 | 580 47th Av | kitchen remodel. all in-kind. removal of a non-load bearing wall per plan, install of a gas insert fire place into existing fire place. no work on the first floor.Details
kitchen remodel. all in-kind. removal of a non-load bearing wall per plan, install of a gas insert fire place into existing fire place. no work on the first floor. | $28,000 |
| May 24, 2012 | Completed final sign-off Jun 2012 | 458 Hearst Av | kitchen remodel-remove all (e) cabinets, re-wire, bring all up to code, meet title 24. relopcate (e) gas line, install new cabinets. new lighting must comply with cec (k) 10Details
kitchen remodel-remove all (e) cabinets, re-wire, bring all up to code, meet title 24. relopcate (e) gas line, install new cabinets. new lighting must comply with cec (k) 10 | $10,000 |
| May 8, 2012 | Expired or cancelled cancelled Jul 2012 | 258 Hearst Av | kitchen remodel: remove all (e) cabinets. rewire bringing up to code meeting tile 24. relocate (e) gas line. install new cabinets and fixtures.Details
kitchen remodel: remove all (e) cabinets. rewire bringing up to code meeting tile 24. relocate (e) gas line. install new cabinets and fixtures. | $10,000 |
| Sep 16, 2011 | Completed final sign-off Jan 2012 | 586 48th Av | kitchen remodel & electrical panel upgrade, full kitchen gut with all new electrical, all plumbing to stay in same location, add new water supply for refigerator, all new cabinets, all in kind.Details
kitchen remodel & electrical panel upgrade, full kitchen gut with all new electrical, all plumbing to stay in same location, add new water supply for refigerator, all new cabinets, all in kind. | $20,000 |
| Jan 28, 2010 | Completed final sign-off Sep 2010 | 170 Pacific Av | remodel kitchen and bathrooms, new recessed light fixtures, plumb gas line to fireplace and range in kitchen. new hardwood floors and new opening in kitchen wallDetails
remodel kitchen and bathrooms, new recessed light fixtures, plumb gas line to fireplace and range in kitchen. new hardwood floors and new opening in kitchen wall | $75,000 |
| Jun 6, 2008 | Completed final sign-off Aug 2009 | 295 Stratford Dr | new rear yard addition and exterior deck/stair, remodel kitchen area.Details
new rear yard addition and exterior deck/stair, remodel kitchen area. | $85,000 |