Back to bathroom remodel contractors
J R G Construction
- Based in
- Pacifica
- On San Francisco permits
- Nov 2007 to Feb 2026
- Last 24 months
- 1 permit filed
30 permits since 2000: 26 completed, 2 never finaled, 2 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 10 completed, 1 never finaled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2026 | Completed final sign-off Jun 2026 | 640 Davis St | in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $49,000 |
| Mar 10, 2020 | Completed final sign-off Sep 2020 | 60 Mangels Av | full remodel of the 2nd fl replacing all windows, full kitchen remodel & bathroom remodel as shown on plans. all windows to remain the same sized locationDetails
full remodel of the 2nd fl replacing all windows, full kitchen remodel & bathroom remodel as shown on plans. all windows to remain the same sized location | $110,000 |
| Jul 19, 2017 | Completed final sign-off Feb 2018 | 2050 18th Av | down stairs remodel: redo master bedroom, master bath & family room, & half bath as shown on plans, replace as needed. add all new electrical. will not move any structural walls or posts.Details
down stairs remodel: redo master bedroom, master bath & family room, & half bath as shown on plans, replace as needed. add all new electrical. will not move any structural walls or posts. | $45,000 |
| Jan 29, 2016 | Completed final sign-off Jun 2016 | 640 Davis St | unit #13: remodel two bathrooms. the master and secondary bathroom. all fixtures to stay in same location, upgrade the electrical , adding recessed led lights and replace existing shower pan. all new tiles, upgrade plumbing where needed. no alteration at wall, window and door.Details
unit #13: remodel two bathrooms. the master and secondary bathroom. all fixtures to stay in same location, upgrade the electrical , adding recessed led lights and replace existing shower pan. all new tiles, upgrade plumbing where needed. no alteration at wall, window and door. | $30,000 |
| Aug 19, 2014 | Never finaled issued Aug 2014, no final | 640 Davis St | one kitchen & one bath remodelling. replace kitchen electric stove w/ gas stove. no change in lay out & opening. all new cabinets in same location. move the gas line to the stove location. all led lighting.Details
one kitchen & one bath remodelling. replace kitchen electric stove w/ gas stove. no change in lay out & opening. all new cabinets in same location. move the gas line to the stove location. all led lighting. | $20,000 |
| Apr 19, 2012 | Completed final sign-off Jul 2012 | 295 Stratford Dr | bathroom remodel - remove all (e) tile and fixtures. rewire and replumb bringing up to code. new shower pan, all new electrical. replace the (e) bathroom fixtures (tub, toilet and sink)Details
bathroom remodel - remove all (e) tile and fixtures. rewire and replumb bringing up to code. new shower pan, all new electrical. replace the (e) bathroom fixtures (tub, toilet and sink) | $14,000 |
| Mar 16, 2012 | Completed final sign-off May 2012 | 586 48th Av | hall bathroom remodel - got the bathroom down to framing. rewire up to code. replumb set new shower pan. retile full bath. bring all up to code. 6'x10' 60 sq. ft. lightingin must comply with cec 150(k)Details
hall bathroom remodel - got the bathroom down to framing. rewire up to code. replumb set new shower pan. retile full bath. bring all up to code. 6'x10' 60 sq. ft. lightingin must comply with cec 150(k) | $10,000 |
| Jan 5, 2012 | Completed final sign-off Feb 2012 | 640 Davis St | remodel of master bathroom, remove existing tub, replace with shower, new shower pan, 2 new light fixtures, new toilets & bathroom fan, tiles. no change on walls and openings.Details
remodel of master bathroom, remove existing tub, replace with shower, new shower pan, 2 new light fixtures, new toilets & bathroom fan, tiles. no change on walls and openings. | $20,000 |
| Aug 23, 2011 | Completed final sign-off Sep 2011 | 14 The Embarcadero | to comply with nov#201152939 - bathroom renovation, remove & replace tile & vanity, replace (e) shower valve, replace 9e) switches and light fixtures and fan.Details
to comply with nov#201152939 - bathroom renovation, remove & replace tile & vanity, replace (e) shower valve, replace 9e) switches and light fixtures and fan. | $2,700 |
| May 25, 2011 | Completed final sign-off Jul 2011 | 251 Flood Av | upgrade and replace heater. upgrade and expand bathroom. move closet. replace double vinyl windows with new door. all work on ground floor.Details
upgrade and replace heater. upgrade and expand bathroom. move closet. replace double vinyl windows with new door. all work on ground floor. | $25,000 |
| Jan 28, 2010 | Completed final sign-off Sep 2010 | 170 Pacific Av | remodel kitchen and bathrooms, new recessed light fixtures, plumb gas line to fireplace and range in kitchen. new hardwood floors and new opening in kitchen wallDetails
remodel kitchen and bathrooms, new recessed light fixtures, plumb gas line to fireplace and range in kitchen. new hardwood floors and new opening in kitchen wall | $75,000 |