J R B Construction
- Based in
- Vallejo
- On San Francisco permits
- Jun 2014 to Oct 2019
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2014 | Completed final sign-off Aug 2014 | 69 Glover St | dry-rot - remove & replace stairs - 3 floors (exactly the same structure, less than 50% to be replaced)Details
dry-rot - remove & replace stairs - 3 floors (exactly the same structure, less than 50% to be replaced) | $8,500 |