Back to bathroom remodel contractors
J R B Construction
- Based in
- Vallejo
- On San Francisco permits
- Jun 2014 to Oct 2019
- Last 24 months
- 0 permits filed
20 permits since 2000: 17 completed, 1 never finaled, 2 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 182 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 7, 2018 | Completed final sign-off Mar 2019 | 256 Grand View Av | revision to pa 2018-0727-5705, convert closet to laundry room, at hall bath convert shower to tub and add wall in bathroom for linen closet.Details
revision to pa 2018-0727-5705, convert closet to laundry room, at hall bath convert shower to tub and add wall in bathroom for linen closet. | $1,000 |
| Jul 27, 2018 | Never finaled issued Jul 2018, no final | 256 Grand View Av | two bathroom remodel. no change to walls & opening layout.Details
two bathroom remodel. no change to walls & opening layout. | $18,000 |
| Jul 11, 2018 | Completed final sign-off Aug 2018 | 250 Evelyn Wy | bathroom remodel.Details
bathroom remodel. | $5,000 |
| Apr 4, 2018 | Completed final sign-off Nov 2019 | 884 Alabama St | 3rd flr unit. full unit remodel, remodel 1 (e) bathroom, 1 new full bath. new gas heating. plywood strengthening new insulation for walls & roof.Details
3rd flr unit. full unit remodel, remodel 1 (e) bathroom, 1 new full bath. new gas heating. plywood strengthening new insulation for walls & roof. | $120,000 |
| Nov 6, 2017 | Completed final sign-off Nov 2019 | 884 Alabama St | exploratory demolition (kitchen, living room, bedroom, bath) total 100 sq ft. remodeling work under separate permit to follow.Details
exploratory demolition (kitchen, living room, bedroom, bath) total 100 sq ft. remodeling work under separate permit to follow. | $6,000 |
| Jun 20, 2017 | Completed final sign-off Aug 2018 | 1441 Jones St | unit 304 : 1 bathroom remodel, 1 kitchen relocation, 1 new bathroom, new hardwood floorsDetails
unit 304 : 1 bathroom remodel, 1 kitchen relocation, 1 new bathroom, new hardwood floors | $75,000 |
| Dec 14, 2015 | Expired or cancelled expired Apr 2017 | 729 Cambridge St | bathroom renovation: 2nd floor - no structural work, same configurationDetails
bathroom renovation: 2nd floor - no structural work, same configuration | $25,000 |
| Dec 4, 2015 | Completed final sign-off Jan 2016 | 1776 Sacramento St | change address from #502. 1776 sacramento st sf to #504. 1776 sacramento st. sf. revision to pa# 201505045240. (remodel one kitchen & two baths) to correct permit address unit # to 504Details
change address from #502. 1776 sacramento st sf to #504. 1776 sacramento st. sf. revision to pa# 201505045240. (remodel one kitchen & two baths) to correct permit address unit # to 504 | |
| Jun 26, 2015 | Completed final sign-off Jul 2015 | 1270 Vermont St | install bathroom fire-rated window. remove and replace (e) window. in-kind replacement, u-factor shall not exceed 0.32, aluminum frame window. not visible from street.Details
install bathroom fire-rated window. remove and replace (e) window. in-kind replacement, u-factor shall not exceed 0.32, aluminum frame window. not visible from street. | $1,500 |
| May 4, 2015 | Completed final sign-off Jan 2016 | 1776 Sacramento St | unit 502: renovation/cabinet install on kitchen, 2 bathrooms. no structural work. compliance with maher ordinance no 155-13 not required.Details
unit 502: renovation/cabinet install on kitchen, 2 bathrooms. no structural work. compliance with maher ordinance no 155-13 not required. | $35,000 |
| Dec 31, 2014 | Completed final sign-off Jun 2015 | 1895 Pacific Av | interior of apartment remodel. removal of partition non load bearing walls. kitchen and bath remodelDetails
interior of apartment remodel. removal of partition non load bearing walls. kitchen and bath remodel | $62,000 |