J P E Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Feb 2019
- Last 24 months
- 0 permits filed
140 permits since 2000: 108 completed, 19 never finaled, 13 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
6 stairs permits: 6 completed. Typically 29 days from filing to permit and 275 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 24, 2018 | Completed final sign-off Mar 2019 | 399 Ellington Av | interior renovations. in-kind repair of front stairway and deck with wood materials, all less than 50% repair.Details
interior renovations. in-kind repair of front stairway and deck with wood materials, all less than 50% repair. | $18,000 |
| Jan 30, 2017 | Completed final sign-off Mar 2018 | 2406 36th Av | at 1st flr - remodel (e) floor space for new full bathroom, family room and bedroom; and relocate (e) w/h/furn/ac, in fill/remove (e) interior stair, new entry main doorDetails
at 1st flr - remodel (e) floor space for new full bathroom, family room and bedroom; and relocate (e) w/h/furn/ac, in fill/remove (e) interior stair, new entry main door | $70,000 |
| Jan 21, 2016 | Completed final sign-off Sep 2016 | 2322 46th Av | repair termite damage front exterior stairs in kindDetails
repair termite damage front exterior stairs in kind | $3,000 |
| Jan 13, 2016 | Completed final sign-off Feb 2021 | 71 Marston Av | rear addition of stories & basement including 3 bedrooms, an exercise room, a family, 2 full bathrooms & interior stairs. add laundry, storage, study & a full bath on 1st floor. replace front exterior stairs, replace window at rear. relocate water heater & firnance. ** maher: n/a **Details
rear addition of stories & basement including 3 bedrooms, an exercise room, a family, 2 full bathrooms & interior stairs. add laundry, storage, study & a full bath on 1st floor. replace front exterior stairs, replace window at rear. relocate water heater & firnance. ** maher: n/a ** | $150,000 |
| Dec 9, 2015 | Completed final sign-off Apr 2017 | 1146 Florida St | convert (e) attic space to living space including study,master suite & (n) dormers; 2nd flr:relocate (e)kitchen,new toilet & remodel (e)space; 1st flr: convert (e)space to new bedrms,full bathrm,playroom & laundry,new interior stair & spiral stair.Details
convert (e) attic space to living space including study,master suite & (n) dormers; 2nd flr:relocate (e)kitchen,new toilet & remodel (e)space; 1st flr: convert (e)space to new bedrms,full bathrm,playroom & laundry,new interior stair & spiral stair. | $90,000 |
| Nov 16, 2004 | Completed final sign-off May 2005 | 858 37th Av | revisions to pa# 2004/05/19/4314. replace rear stairway as required by bldg dept.Details
revisions to pa# 2004/05/19/4314. replace rear stairway as required by bldg dept. | $4,000 |