Back to bathroom remodel contractors
J P E Construction
- Based in
- San Francisco
- On San Francisco permits
- Sep 2003 to Feb 2019
- Last 24 months
- 0 permits filed
140 permits since 2000: 108 completed, 19 never finaled, 13 expired or cancelled.
Of the 19 never-finaled permits, 2 are 5 to 10 years old, 17 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
67 bathroom remodel permits: 55 completed, 5 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 28, 2019 | Completed final sign-off Jun 2021 | 175 Caine Av | remodel ground fl. to have (2) bedrooms, (1) full bathroom, storage & laundy, add 1-hr fire rated wall to separate habitable spaces with garage, remodel basement to have (2 bedrooms, 2 full bathroom, install gas furnae & water heaterDetails
remodel ground fl. to have (2) bedrooms, (1) full bathroom, storage & laundy, add 1-hr fire rated wall to separate habitable spaces with garage, remodel basement to have (2 bedrooms, 2 full bathroom, install gas furnae & water heater | $42,000 |
| Dec 27, 2018 | Completed final sign-off Sep 2019 | 451 Naples St | 1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls.Details
1/f-add 2 (n) bedrms, 1 (n) full bath, (n) home theater w/ bar sink, (n) mud rm. 2/f-remodel (e) bathrm, add (n) half-bath, remodel (e) kitchen. 3/f-convert (e) bedrm to (n) full bath. no new fire walls. | $120,000 |
| Dec 12, 2018 | Completed final sign-off Jun 2019 | 331 28th Av | 1) a)remodel extg bathroom and add 1 new bathroom at 3rd floor. b)add 1 new bathroom at 2nd floor.Details
1) a)remodel extg bathroom and add 1 new bathroom at 3rd floor. b)add 1 new bathroom at 2nd floor. | $36,000 |
| Nov 20, 2018 | Expired or cancelled expired Dec 2023 | 221 Brookdale Av | to comply with nov 201886498 - demolish illegal rear addition at 1st fl; existing 1st floor remodeling - install 1 bathroom, convert existing bathroom to walk-in-closetDetails
to comply with nov 201886498 - demolish illegal rear addition at 1st fl; existing 1st floor remodeling - install 1 bathroom, convert existing bathroom to walk-in-closet | $5,000 |
| Sep 18, 2018 | Completed final sign-off Apr 2019 | 2125 21st Av | g/f: add 2 bedrooms, office room, 1-1/2 bathroomDetails
g/f: add 2 bedrooms, office room, 1-1/2 bathroom | $50,000 |
| Sep 18, 2018 | Completed final sign-off Dec 2018 | 223 Sawyer St | g/f: add family room, bedroom & bathroom.Details
g/f: add family room, bedroom & bathroom. | $50,000 |
| Jun 18, 2018 | Completed final sign-off Aug 2018 | 90 Fernwood Dr | to comply with nov#201854805: removal of bathroom to revert back to last legal layout use.Details
to comply with nov#201854805: removal of bathroom to revert back to last legal layout use. | $500 |
| Nov 20, 2017 | Completed final sign-off Apr 2018 | 1375 40th Av | install 1 storage room, bedroom, family room, 2 bathrooms on garage level. 2/f bathroom and kitchen remodelDetails
install 1 storage room, bedroom, family room, 2 bathrooms on garage level. 2/f bathroom and kitchen remodel | $65,000 |
| Sep 13, 2017 | Completed final sign-off Apr 2018 | 123 Victoria St | add one family room, one bedroom, one storage room & one bathroom on garage floor; exchange new drywall in the 2nd floor; remodel existing kitchen & bathroom on 2nd floor; add one new bathroom on the 2nd floor.Details
add one family room, one bedroom, one storage room & one bathroom on garage floor; exchange new drywall in the 2nd floor; remodel existing kitchen & bathroom on 2nd floor; add one new bathroom on the 2nd floor. | $80,000 |
| Aug 10, 2017 | Completed final sign-off Dec 2018 | 120 San Pablo Av | 1st floor - foundation work only. 2nd floor - remodel kitchen and half bath; 3rd floor - remodel 2 bathsDetails
1st floor - foundation work only. 2nd floor - remodel kitchen and half bath; 3rd floor - remodel 2 baths | $40,000 |
| May 24, 2017 | Completed final sign-off Mar 2018 | 1323 39th Av | add family room, 1 bedroom and a full bathroom on the 1st floor. relocate furnace, water heater and laundry facilitiesDetails
add family room, 1 bedroom and a full bathroom on the 1st floor. relocate furnace, water heater and laundry facilities | $70,000 |
| May 17, 2017 | Completed final sign-off Sep 2017 | 234 Byxbee St | 2nd floor kitchen remodel. garage floor bathroom remodel. high efficacy lighting. no change in wall and opening layout.Details
2nd floor kitchen remodel. garage floor bathroom remodel. high efficacy lighting. no change in wall and opening layout. | $8,000 |
| May 5, 2017 | Expired or cancelled expired Dec 2025 | 263 Naples St | eliminate clst, reconfig hallway bath to create 1 hallway bath,1 mstr bath 2nd fl.remodel kitchen, new lighting and controls. drywall, paint, enclose fireplace,add bookshlf,windws 2nd lvel except strt facing,update elc, plumb, gr fl remodel bdrm,office, 1 full bathDetails
eliminate clst, reconfig hallway bath to create 1 hallway bath,1 mstr bath 2nd fl.remodel kitchen, new lighting and controls. drywall, paint, enclose fireplace,add bookshlf,windws 2nd lvel except strt facing,update elc, plumb, gr fl remodel bdrm,office, 1 full bath | $65,000 |
| Mar 22, 2017 | Completed final sign-off Apr 2017 | 2215 24th Av | remodel kitchen and (1) bathroom.Details
remodel kitchen and (1) bathroom. | $45,000 |
| Jan 30, 2017 | Completed final sign-off Mar 2018 | 2406 36th Av | at 1st flr - remodel (e) floor space for new full bathroom, family room and bedroom; and relocate (e) w/h/furn/ac, in fill/remove (e) interior stair, new entry main doorDetails
at 1st flr - remodel (e) floor space for new full bathroom, family room and bedroom; and relocate (e) w/h/furn/ac, in fill/remove (e) interior stair, new entry main door | $70,000 |
| Jan 11, 2017 | Never finaled issued Jan 2017, no final | 595 Myra Wy | add 1 family room, 1 bedrom and 1 bathroom in the garage floor. install 1 new window and replace 1 existing window at the back.Details
add 1 family room, 1 bedrom and 1 bathroom in the garage floor. install 1 new window and replace 1 existing window at the back. | $65,000 |
| Dec 5, 2016 | Completed final sign-off Apr 2017 | 600 Presidio Av | remodel 3 bathrooms in rooms 2/3/4, not adding or moving walls. repair dry rot - replace sheetrock. h.e. lighting in bathroom, lighting with auto-off sensor switch.Details
remodel 3 bathrooms in rooms 2/3/4, not adding or moving walls. repair dry rot - replace sheetrock. h.e. lighting in bathroom, lighting with auto-off sensor switch. | $15,000 |
| Sep 8, 2016 | Completed final sign-off Nov 2016 | 3430 Quintara St | 2nd floor bathroom remodel exchange bathtub , sink & toilet. like for likeDetails
2nd floor bathroom remodel exchange bathtub , sink & toilet. like for like | $8,000 |
| Aug 26, 2016 | Completed final sign-off Mar 2017 | 133 Rae Av | add 2 new bedrooms & 2 full bathrooms, one laundry room, one storage room on the ground floor.Details
add 2 new bedrooms & 2 full bathrooms, one laundry room, one storage room on the ground floor. | $65,000 |
| Apr 26, 2016 | Completed final sign-off Mar 2018 | 469 Sunrise Wy | add 2 bedrooms, 2 full baths at gr fl, add 1 storage rm. replace front stucco in kindDetails
add 2 bedrooms, 2 full baths at gr fl, add 1 storage rm. replace front stucco in kind | $48,000 |
| Feb 29, 2016 | Completed final sign-off Nov 2016 | 1058 Plymouth Av | add 2 bedrooms, 1 laundry room & storage space, and 2 bathrooms in the garage floor. remodel and relocate 2nd flr kitchen, convert the 2nd flr kitchen space to bedroom and add 1 bathroom and remodel e bathroom on the 2nd flr.Details
add 2 bedrooms, 1 laundry room & storage space, and 2 bathrooms in the garage floor. remodel and relocate 2nd flr kitchen, convert the 2nd flr kitchen space to bedroom and add 1 bathroom and remodel e bathroom on the 2nd flr. | $65,000 |
| Feb 26, 2016 | Completed final sign-off Jan 2017 | 240 Beverly St | legalize of unit per ord #43-14. 1)permit & conversion of laundry rm to kitchen (legalize kitchen), 2)relocate laundry to garage & obtain permit, 3)fix vent & obtain permit for water heater & install furnace, 4)remove half bath & convert to storage rm. remove basin. comply w/ complaint #201689571Details
legalize of unit per ord #43-14. 1)permit & conversion of laundry rm to kitchen (legalize kitchen), 2)relocate laundry to garage & obtain permit, 3)fix vent & obtain permit for water heater & install furnace, 4)remove half bath & convert to storage rm. remove basin. comply w/ complaint #201689571 | $4,800 |
| Jan 26, 2016 | Completed final sign-off Oct 2016 | 312 Mount Vernon Av | garage floor: add storage room & 1 (n) bathroom.Details
garage floor: add storage room & 1 (n) bathroom. | $35,000 |
| Jan 13, 2016 | Completed final sign-off Feb 2021 | 71 Marston Av | rear addition of stories & basement including 3 bedrooms, an exercise room, a family, 2 full bathrooms & interior stairs. add laundry, storage, study & a full bath on 1st floor. replace front exterior stairs, replace window at rear. relocate water heater & firnance. ** maher: n/a **Details
rear addition of stories & basement including 3 bedrooms, an exercise room, a family, 2 full bathrooms & interior stairs. add laundry, storage, study & a full bath on 1st floor. replace front exterior stairs, replace window at rear. relocate water heater & firnance. ** maher: n/a ** | $150,000 |
| Jan 8, 2016 | Completed final sign-off Jun 2016 | 1215 37th Av | remodel 2 kitchens and 2 baths.Details
remodel 2 kitchens and 2 baths. | $30,000 |
| Oct 27, 2015 | Completed final sign-off Jan 2016 | 1751 Quesada Av | 2/f one kitchen & three bathroom remodel.Details
2/f one kitchen & three bathroom remodel. | $45,000 |
| Sep 23, 2015 | Never finaled issued Sep 2015, no final | 1710 26th Av | convert closet into 1 full bathroom at 2nd floor.Details
convert closet into 1 full bathroom at 2nd floor. | $12,000 |
| Mar 16, 2015 | Never finaled issued Mar 2015, no final | 2486 42nd Av | ground floor, bedroom, office, laundry and one bathroom.Details
ground floor, bedroom, office, laundry and one bathroom. | $35,000 |
| Mar 16, 2015 | Completed final sign-off Jul 2015 | 258 Lisbon St | ground floor: 2 bedrooms, one laundry room and one bathroom.Details
ground floor: 2 bedrooms, one laundry room and one bathroom. | $35,000 |
| Jan 9, 2015 | Completed final sign-off Sep 2015 | 566 48th Av | remodeling kitchen,& 3 bathroom remodeling on 2nd & 3rd floor. replace all windows & sliding doors.Details
remodeling kitchen,& 3 bathroom remodeling on 2nd & 3rd floor. replace all windows & sliding doors. | $80,000 |
| Dec 16, 2014 | Completed final sign-off Mar 2015 | 636 Girard St | add family room, one bedroom, 2 half bath rooms and laundry at 1/f per plan.Details
add family room, one bedroom, 2 half bath rooms and laundry at 1/f per plan. | $35,700 |
| Oct 17, 2014 | Expired or cancelled expired Nov 2017 | 818 36th Av | ground floor 1/2 bathroom remodel, add a shower pan in the existing bathroom, relocate the toilet and sink.Details
ground floor 1/2 bathroom remodel, add a shower pan in the existing bathroom, relocate the toilet and sink. | $2,000 |
| Aug 22, 2014 | Completed final sign-off Dec 2014 | 2106 34th Av | remodel existing rooms in ground floor level and add 1 living and 1 study room; a full bath room, relocate existing exit door to rear yard.Details
remodel existing rooms in ground floor level and add 1 living and 1 study room; a full bath room, relocate existing exit door to rear yard. | $12,000 |
| Apr 14, 2014 | Completed final sign-off Jun 2014 | 78 Chicago Wy | remodel one (1) bathroom and one (1) kitchen.Details
remodel one (1) bathroom and one (1) kitchen. | $18,000 |
| Mar 4, 2014 | Completed final sign-off Sep 2014 | 29 Lake Forest Ct | remodel 1/f 2 bathroom, to full bathroom, relocate full bathroom into new closet.Details
remodel 1/f 2 bathroom, to full bathroom, relocate full bathroom into new closet. | $25,000 |
| Dec 30, 2013 | Completed final sign-off Apr 2014 | 31 Cuvier St | revision to 201309045919. relocate 1st fl bathroom. relocate 1 wall to postDetails
revision to 201309045919. relocate 1st fl bathroom. relocate 1 wall to post | |
| Aug 12, 2013 | Completed final sign-off Dec 2013 | 481 Faxon Av | 2nd floor - alter existing floor layout included remodeling (e) kitchen, (e) bathroom, enclosed (e) dining room for study & new bathroom. replace (2) skylights w/glass skylights.Details
2nd floor - alter existing floor layout included remodeling (e) kitchen, (e) bathroom, enclosed (e) dining room for study & new bathroom. replace (2) skylights w/glass skylights. | $25,000 |
| Feb 28, 2013 | Completed final sign-off Apr 2013 | 650 24th Av | add shower on ground floor. revision to pa# 201212316996+; to make it as full bathDetails
add shower on ground floor. revision to pa# 201212316996+; to make it as full bath | |
| Jan 9, 2013 | Completed final sign-off Mar 2013 | 169 Orizaba Av | ground floor, (n) guest room, (n) living room. laundry room, 2nd floor, 1 new bathroom.Details
ground floor, (n) guest room, (n) living room. laundry room, 2nd floor, 1 new bathroom. | $25,000 |
| Dec 31, 2012 | Completed final sign-off Apr 2013 | 650 24th Av | enclosed wall at back of bldg. add 2 bedrooms, half bath & work shops at ground floor.Details
enclosed wall at back of bldg. add 2 bedrooms, half bath & work shops at ground floor. | $25,000 |
| Nov 27, 2012 | Completed final sign-off Jul 2013 | 106 Clearfield Dr | ground floor:add one and a half bathroom and a new bedroom and a laundryroom.Details
ground floor:add one and a half bathroom and a new bedroom and a laundryroom. | $48,000 |
| Oct 23, 2012 | Completed final sign-off Mar 2013 | 700 Capitol Av | remodel (e) bathroom & add new bathroom on 2nd floor. install new family room, 1 bedroom & 1 toilet room on ground floor (garage/1st floor)Details
remodel (e) bathroom & add new bathroom on 2nd floor. install new family room, 1 bedroom & 1 toilet room on ground floor (garage/1st floor) | $30,000 |
| Mar 19, 2012 | Never finaled issued Mar 2012, no final | 2259 27th Av | install new storage room, one bath on ground floor.Details
install new storage room, one bath on ground floor. | $3,500 |
| Aug 16, 2011 | Expired or cancelled expired Dec 2012 | 201 Juanita Wy | remodel kitchen & bathroom on 2nd floor.Details
remodel kitchen & bathroom on 2nd floor. | $8,000 |
| Oct 4, 2010 | Completed final sign-off Jan 2011 | 3035 22nd Av | convert existing 1/2 bath to full bath. update existing full bath at master bedroom. remodel kitchen.Details
convert existing 1/2 bath to full bath. update existing full bath at master bedroom. remodel kitchen. | $8,000 |
| Jul 7, 2010 | Completed final sign-off Oct 2010 | 74 Girard St | ground floor: add new bedroom, two full bathrooms, and a laundry roomDetails
ground floor: add new bedroom, two full bathrooms, and a laundry room | $1,500 |
| Apr 15, 2010 | Completed final sign-off Jun 2010 | 410 Elmira St | remodel bathroom & kitchen. add (n) bathroom @ second flr.Details
remodel bathroom & kitchen. add (n) bathroom @ second flr. | $15,000 |
| Mar 11, 2010 | Completed final sign-off Jan 2011 | 2832 Anza St | add one family room, two bedrooms and one full bathroom in garage floor. add one bedroom, one bath in 2nd floor and 3rd floor. enlarge opening, remodel (e) kitchen and (e) bathroom in 2nd floor 3rd floor. replace drywall for 2 (e) bedrooms, (e) dinning room & (e) living room in 2nd level & 3rd levelDetails
add one family room, two bedrooms and one full bathroom in garage floor. add one bedroom, one bath in 2nd floor and 3rd floor. enlarge opening, remodel (e) kitchen and (e) bathroom in 2nd floor 3rd floor. replace drywall for 2 (e) bedrooms, (e) dinning room & (e) living room in 2nd level & 3rd level | $80,000 |
| Dec 18, 2009 | Never finaled issued Dec 2009, no final | 261 Morningside Dr | remodel 2 bathrooms at 2nd flDetails
remodel 2 bathrooms at 2nd fl | $18,000 |
| Jun 5, 2009 | Completed final sign-off Oct 2009 | 1851 32nd Av | new bedroom and new bathroom @ garage level.Details
new bedroom and new bathroom @ garage level. | $15,000 |
| May 21, 2009 | Completed final sign-off Aug 2009 | 2355 18th Av | 1 bathroom remodel on 2nd floor. no structural work.Details
1 bathroom remodel on 2nd floor. no structural work. | $9,000 |
| Sep 24, 2007 | Completed final sign-off Nov 2007 | 2337 Vicente St | remodel kitchen on 2/f. construct 2 new bedrooms and playroom & bathroom on ground floor, replace water heater and remove g/f kitchen.Details
remodel kitchen on 2/f. construct 2 new bedrooms and playroom & bathroom on ground floor, replace water heater and remove g/f kitchen. | $30,000 |
| Aug 27, 2007 | Completed final sign-off Apr 2008 | 110 Westgate Dr | rearrange existing laundry room and study room for two new bedrooms and full bathroom, and storage area at the ground floor.Details
rearrange existing laundry room and study room for two new bedrooms and full bathroom, and storage area at the ground floor. | $20,000 |
| Jul 6, 2007 | Completed final sign-off Oct 2007 | 591 47th Av | remodel kitchen and bathroom. nonstructural work. not moving any walls or changing door or window openings. installation to comply with energy codes title 24.Details
remodel kitchen and bathroom. nonstructural work. not moving any walls or changing door or window openings. installation to comply with energy codes title 24. | $12,000 |
| May 25, 2007 | Completed final sign-off Aug 2007 | 4338 Balboa St | remove bath at ground floor. revision to pa#200705211855.Details
remove bath at ground floor. revision to pa#200705211855. | |
| May 10, 2007 | Completed final sign-off Sep 2008 | 308 Gold Mine Dr | project consists of replacing kitchen appliances & cabinets in the (e) kitchen. existing entertainment room will be converted into a master bedroom with bathroom. existing bathroom will have tub, replace with spa tub and shower.Details
project consists of replacing kitchen appliances & cabinets in the (e) kitchen. existing entertainment room will be converted into a master bedroom with bathroom. existing bathroom will have tub, replace with spa tub and shower. | $40,000 |
| Nov 8, 2006 | Completed final sign-off Jan 2007 | 67 Lawrence Av | add laundry room, storage room on grade. remodel (e) bathroom.Details
add laundry room, storage room on grade. remodel (e) bathroom. | $5,000 |
| Oct 4, 2006 | Expired or cancelled expired Nov 2019 | 182 Dublin St | revision to appl#200604128749 to add shower in (e) bath and replace garage door.Details
revision to appl#200604128749 to add shower in (e) bath and replace garage door. | $200 |
| Sep 1, 2006 | Completed final sign-off Dec 2006 | 1344 Balboa St | apr#2 kitchen remodel /bathroom remodel at existing kitch/bath. no changes to partitions or windows at unit#2.Details
apr#2 kitchen remodel /bathroom remodel at existing kitch/bath. no changes to partitions or windows at unit#2. | $20,000 |
| Jul 20, 2006 | Expired or cancelled expired Sep 2024 | 159 Sadowa St | legalize garage level to comply with 200666842. remove 2 illegal kitchens, 1 bath behind garage. legalize one 1/2 bath and storage roomsDetails
legalize garage level to comply with 200666842. remove 2 illegal kitchens, 1 bath behind garage. legalize one 1/2 bath and storage rooms | $1,500 |
| Apr 12, 2006 | Expired or cancelled expired Sep 2009 | 182 Dublin St | legalize ground floor work, comply w/nov#200563517 full bathroom @ rear of garage & two storage rooms adjacent to the garage.Details
legalize ground floor work, comply w/nov#200563517 full bathroom @ rear of garage & two storage rooms adjacent to the garage. | $5,000 |
| Nov 7, 2005 | Completed final sign-off Dec 2005 | 112 Huntington Dr | remodel (e) bathroom in basement, replace water heater & heater at g/f. water heater & heater to have t-24 energy compliance efficiencies at (e) location.Details
remodel (e) bathroom in basement, replace water heater & heater at g/f. water heater & heater to have t-24 energy compliance efficiencies at (e) location. | $5,000 |
| Jul 6, 2005 | Completed final sign-off Nov 2005 | 2666 39th Av | remodel kitchen/bathroom, replace 2 windows size/location,visible from street.Details
remodel kitchen/bathroom, replace 2 windows size/location,visible from street. | $15,000 |
| Jun 9, 2005 | Completed final sign-off Sep 2005 | 2362 Alemany Bl | add rooms at g/f,bedroom,1 bath,storage,laundry,up remodel bath.Details
add rooms at g/f,bedroom,1 bath,storage,laundry,up remodel bath. | $21,000 |
| Jun 6, 2005 | Completed final sign-off Jul 2005 | 2938 Moraga St | add rooms at ground fl,2 bedroom, one baths , 2 storage room.Details
add rooms at ground fl,2 bedroom, one baths , 2 storage room. | $21,000 |
| Mar 14, 2005 | Completed final sign-off May 2005 | 2828 Noriega St | new family room, new bathroom in g/fDetails
new family room, new bathroom in g/f | $9,000 |
| Nov 16, 2004 | Completed final sign-off Feb 2005 | 2816 Noriega St | build a bedroom & bathroom behind the garage.Details
build a bedroom & bathroom behind the garage. | $18,000 |