Back to kitchen remodel contractors
J P Builders Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2006 to Mar 2016
- Last 24 months
- 0 permits filed
38 permits since 2000: 26 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
5 kitchen remodel permits: 3 completed, 2 never finaled. Typically 1 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2013 | Completed final sign-off Sep 2013 | 1306 04th Av | interior remodel of extg kitchen adding washer and dryer to extg storage room.Details
interior remodel of extg kitchen adding washer and dryer to extg storage room. | $12,000 |
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 1900 Broadway | work is at unit # 4: kitchen and bathroom remodel, relocate washer/dryer from kitchen to hallway closet. remodel areas include (e) kitchen (130 sq. ft), master bathroom (45 sq. ft) and hallway bthroom (51 sq. ft.) lighting must comply with cec 150(k). dryer exhaust duct to be reused.Details
work is at unit # 4: kitchen and bathroom remodel, relocate washer/dryer from kitchen to hallway closet. remodel areas include (e) kitchen (130 sq. ft), master bathroom (45 sq. ft) and hallway bthroom (51 sq. ft.) lighting must comply with cec 150(k). dryer exhaust duct to be reused. | $50,000 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 1519 11th Av | remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street.Details
remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street. | $80,000 |
| Sep 26, 2008 | Never finaled issued Sep 2008, no final | 421 Tehama St | interior remodel of a 3 floor concrete & heavy timber framed live/work space. proposed new work includes relcoated garage partition, remodel of (e) bathroom, relocate (e) kitchen & 2 new bedrooms. no structural work. no changes to exterior facade.Details
interior remodel of a 3 floor concrete & heavy timber framed live/work space. proposed new work includes relcoated garage partition, remodel of (e) bathroom, relocate (e) kitchen & 2 new bedrooms. no structural work. no changes to exterior facade. | $95,000 |
| Jun 12, 2007 | Never finaled issued Apr 2008, no final | 131 Alma St | add family room and extend kitchen on 1st floor (rear addition). add master suite on 2nd floor (rear addition).Details
add family room and extend kitchen on 1st floor (rear addition). add master suite on 2nd floor (rear addition). | $150,000 |