J P Builders Inc
- Based in
- Oakland
- On San Francisco permits
- Dec 2006 to Mar 2016
- Last 24 months
- 0 permits filed
38 permits since 2000: 26 completed, 10 never finaled, 2 expired or cancelled.
Of the 10 never-finaled permits, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 never finaled. Typically 2 days from filing to permit and 156 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2011 | Completed final sign-off Oct 2011 | 1900 Broadway | work is at unit # 4: kitchen and bathroom remodel, relocate washer/dryer from kitchen to hallway closet. remodel areas include (e) kitchen (130 sq. ft), master bathroom (45 sq. ft) and hallway bthroom (51 sq. ft.) lighting must comply with cec 150(k). dryer exhaust duct to be reused.Details
work is at unit # 4: kitchen and bathroom remodel, relocate washer/dryer from kitchen to hallway closet. remodel areas include (e) kitchen (130 sq. ft), master bathroom (45 sq. ft) and hallway bthroom (51 sq. ft.) lighting must comply with cec 150(k). dryer exhaust duct to be reused. | $50,000 |
| Feb 9, 2011 | Completed final sign-off Aug 2011 | 1519 11th Av | remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street.Details
remodel/relocate existing kitchen and bath on 2nd floor. removal of indicated interior walls. add fixed window on north rear elevation, not visible from street. | $80,000 |
| Dec 15, 2010 | Completed final sign-off Oct 2011 | 521 Buena Vista West Av | revision to #201011165089 - add internal connection stair bet gr flr & 2nd flr. remove gr fl office, reconfig mech,laundry & 1/2 bath.replace & widen e garage dr, replace (e) adj garage door, demo & replace portion n. stair landing at front w/decomposed granite, add n window & gr flr 1/2 bath.Details
revision to #201011165089 - add internal connection stair bet gr flr & 2nd flr. remove gr fl office, reconfig mech,laundry & 1/2 bath.replace & widen e garage dr, replace (e) adj garage door, demo & replace portion n. stair landing at front w/decomposed granite, add n window & gr flr 1/2 bath. | $40,000 |
| Nov 16, 2010 | Completed final sign-off Oct 2011 | 521 Buena Vista West Av | revision to 201006255369: replace and level slab, add 1/2 bath to gr fl, replace gr fl windows to match existing, new radiant heating system at gr flr and 1st flDetails
revision to 201006255369: replace and level slab, add 1/2 bath to gr fl, replace gr fl windows to match existing, new radiant heating system at gr flr and 1st fl | $60,000 |
| Sep 26, 2008 | Never finaled issued Sep 2008, no final | 421 Tehama St | interior remodel of a 3 floor concrete & heavy timber framed live/work space. proposed new work includes relcoated garage partition, remodel of (e) bathroom, relocate (e) kitchen & 2 new bedrooms. no structural work. no changes to exterior facade.Details
interior remodel of a 3 floor concrete & heavy timber framed live/work space. proposed new work includes relcoated garage partition, remodel of (e) bathroom, relocate (e) kitchen & 2 new bedrooms. no structural work. no changes to exterior facade. | $95,000 |