J O B James Ostergar Built
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Jun 2011
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
1 roof deck permit: 1 completed. Typically 6 days from filing to permit and 296 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 10, 2010 | Completed final sign-off Sep 2011 | 28 Virginia Av | response to partial report of physical inspection cc-5769 dated april 28, 2010. item #2: engineering drawings and calculations for garage ceiling beam. item #5: remove existing undocumented roof deck.Details
response to partial report of physical inspection cc-5769 dated april 28, 2010. item #2: engineering drawings and calculations for garage ceiling beam. item #5: remove existing undocumented roof deck. | $5,000 |