Back to kitchen remodel contractors
J O B James Ostergar Built
- Based in
- San Francisco
- On San Francisco permits
- Feb 2005 to Jun 2011
- Last 24 months
- 0 permits filed
19 permits since 2000: 15 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2009 | Completed final sign-off Oct 2010 | 177 Marview Wy | replace (e) cabinets & (e) appliances in kitchen, same layout, re-do 3 bathrooms/tile only, paint interior of the house.Details
replace (e) cabinets & (e) appliances in kitchen, same layout, re-do 3 bathrooms/tile only, paint interior of the house. | $15,000 |
| Jul 2, 2009 | Completed final sign-off Sep 2009 | 286 31st Av | retrofit (e) cabinets for kitchen remodel. replace countertop & back splash. update electrical, reinstall sink & appliances. min. 50% of kitchen light wattage shall be of fluorecent lights.Details
retrofit (e) cabinets for kitchen remodel. replace countertop & back splash. update electrical, reinstall sink & appliances. min. 50% of kitchen light wattage shall be of fluorecent lights. | $10,000 |
| Mar 6, 2009 | Completed final sign-off Jun 2009 | 3913 22nd St | cosmetic upgrade of kitchen & bath, remodel 4 kitchens and 4 baths total, replacing fixtures,cabinets,tile,counter tops, no change wall size and openings, one kitchen each unit total 4 and one bath each unit total 4Details
cosmetic upgrade of kitchen & bath, remodel 4 kitchens and 4 baths total, replacing fixtures,cabinets,tile,counter tops, no change wall size and openings, one kitchen each unit total 4 and one bath each unit total 4 | $68,755 |
| Jan 12, 2009 | Completed final sign-off Jan 2010 | 1681 Noe St | condo convertion as seen in inspection report 3r-5010. repair will address all items. 1 through 12 in the 3r reports incl. kitchen remodel and window repair at the upper unit.Details
condo convertion as seen in inspection report 3r-5010. repair will address all items. 1 through 12 in the 3r reports incl. kitchen remodel and window repair at the upper unit. | $25,000 |
| Sep 18, 2007 | Completed final sign-off Oct 2007 | 193 Downey St | light elect. kitchen seperate permit. light plumbing. kitchen seperate permit. remove necess. rock for trades. patch & paint as necessary.Details
light elect. kitchen seperate permit. light plumbing. kitchen seperate permit. remove necess. rock for trades. patch & paint as necessary. | $5,000 |
| Jul 27, 2007 | Never finaled issued Jul 2007, no final | 525 Laguna St | remove (e) kitchen equipemnt. refinish epoxy floor. replace kitchen equipment. replace some stainless on walls. temporary move elec on wall for app. of stainless. secure electrical & plumbing permit as required.Details
remove (e) kitchen equipemnt. refinish epoxy floor. replace kitchen equipment. replace some stainless on walls. temporary move elec on wall for app. of stainless. secure electrical & plumbing permit as required. | $20,000 |
| Feb 9, 2005 | Completed final sign-off Sep 2005 | 313 02nd Av | kitchen remodel0 replace cabinetry, knock non load bearying wall, replace appliances & fixxtures,Details
kitchen remodel0 replace cabinetry, knock non load bearying wall, replace appliances & fixxtures, | $15,000 |