Back to kitchen remodel contractors
J M K Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Jan 2000 to Jan 2022
- Last 24 months
- 0 permits filed
174 permits since 2000: 118 completed, 22 never finaled, 34 expired or cancelled.
Of the 22 never-finaled permits, 4 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 21 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2019 | Completed final sign-off Mar 2021 | 2269 Washington St | addition of an elevator at all floors. remodel of kitchen, laundry, powder rooms and bathroomsDetails
addition of an elevator at all floors. remodel of kitchen, laundry, powder rooms and bathrooms | $295,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 946 Stockton St | unit 17f: kitchen (60 sq. ft.) & bath (40 sq. ft.) renewal, new cabinets & counters, tile shower, no structural alterations.Details
unit 17f: kitchen (60 sq. ft.) & bath (40 sq. ft.) renewal, new cabinets & counters, tile shower, no structural alterations. | $22,000 |
| Aug 16, 2019 | Never finaled issued Sep 2019, no final | 2939 Vallejo St | rear yard modifications to expand useable area. add bay window to 2nd floor on south facade. modifications to extg kitchenDetails
rear yard modifications to expand useable area. add bay window to 2nd floor on south facade. modifications to extg kitchen | |
| Sep 13, 2018 | Expired or cancelled cancelled May 2020 | 2939 Vallejo St | rear yard modifications to expand useable rear yard area. add bay window to 2nd floor on south (rear yard) facade. modifications to existing kitchenDetails
rear yard modifications to expand useable rear yard area. add bay window to 2nd floor on south (rear yard) facade. modifications to existing kitchen | $350,000 |
| Mar 29, 2018 | Completed final sign-off Mar 2021 | 330 Douglass St | revision to 201803073052 structrual work for new haeder over windowed kitchen door opening & localized seismic stregtheningDetails
revision to 201803073052 structrual work for new haeder over windowed kitchen door opening & localized seismic stregthening | $20,000 |
| Jan 26, 2016 | Completed final sign-off Jun 2016 | 55 Allston Wy | remodel (e) kitchen, add lighting, new cabinets, & counters, new appliances, paint. no layout change.Details
remodel (e) kitchen, add lighting, new cabinets, & counters, new appliances, paint. no layout change. | $18,000 |
| Jan 20, 2016 | Completed final sign-off Dec 2018 | 169 Upper Tr | interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel.Details
interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel. | $440,000 |
| Oct 7, 2015 | Completed final sign-off Jul 2016 | 61 Jordan Av | install new kitchen cabinets & counter. replace/repair 2 existing dry rotted windows in kind. remodel existing bath with new. fixtures & tile. no structural changes.Details
install new kitchen cabinets & counter. replace/repair 2 existing dry rotted windows in kind. remodel existing bath with new. fixtures & tile. no structural changes. | $55,000 |
| Apr 16, 2014 | Completed final sign-off Sep 2014 | 2288 Broadway | install new kitchen counter, vinyl floor, install new shower stall tile. install localized water shut offs. kitchen area 110 sq ft.Details
install new kitchen counter, vinyl floor, install new shower stall tile. install localized water shut offs. kitchen area 110 sq ft. | $22,000 |
| Apr 26, 2013 | Completed final sign-off Apr 2016 | 3675 Washington St | romodel of (e) basement, expansion & remodel of (e) garage level, modify (e) kitchen , elevator, deferred sprinkler and shoring permits.Details
romodel of (e) basement, expansion & remodel of (e) garage level, modify (e) kitchen , elevator, deferred sprinkler and shoring permits. | $600,000 |
| Mar 20, 2013 | Never finaled issued Mar 2013, no final | 2330 Vallejo St | replace kitchen tile counter with granite, new appliances, install new washer & dryer. no alteration at partition wall.Details
replace kitchen tile counter with granite, new appliances, install new washer & dryer. no alteration at partition wall. | $15,000 |
| Jan 26, 2012 | Completed final sign-off Feb 2013 | 1930 California St | g/f, enclosed common area entry area w/ main door and sidelite. replace garage door w/ like kind. 1st fl: replace existing w/ guard rail. combine bedrms to one large rm.bi-fold door & swing door in new rm. rear deck w/ gas fire bowl. 2nd fl: replace w/ new guard rail. kitchen remodel & relocat skylDetails
g/f, enclosed common area entry area w/ main door and sidelite. replace garage door w/ like kind. 1st fl: replace existing w/ guard rail. combine bedrms to one large rm.bi-fold door & swing door in new rm. rear deck w/ gas fire bowl. 2nd fl: replace w/ new guard rail. kitchen remodel & relocat skyl | $150,000 |
| Mar 30, 2009 | Completed final sign-off Jun 2009 | 128 Clipper St | remodel extg 1st floor kitchen and add rear 1st floor deck & stairs at rear. remove 7 windows single pane. replace 3 wndws and 1 set french doors, dual glaze. (n) plywd sheathing @ rear walls.Details
remodel extg 1st floor kitchen and add rear 1st floor deck & stairs at rear. remove 7 windows single pane. replace 3 wndws and 1 set french doors, dual glaze. (n) plywd sheathing @ rear walls. | $30,000 |
| Dec 18, 2007 | Completed final sign-off Jun 2008 | 1070 Green St | install ceilings, cables, and phone lines, replace doors w/ new panel doors, install new desk entertainment center, and kitchen cabinets.Details
install ceilings, cables, and phone lines, replace doors w/ new panel doors, install new desk entertainment center, and kitchen cabinets. | $30,000 |
| Sep 28, 2007 | Completed final sign-off Sep 2008 | 3501 Jackson St | new elevator, basement remodel, garage conversion to wine storage room, office conversion to new bath, kitchen remodel, master bath remodel, third floor bedroom remodelDetails
new elevator, basement remodel, garage conversion to wine storage room, office conversion to new bath, kitchen remodel, master bath remodel, third floor bedroom remodel | $425,000 |
| Nov 6, 2006 | Completed final sign-off Dec 2007 | 2288 Broadway | unit 6 interior remodel including kitchen & bathrooms.remove non structural partitions.install new walls as noted.new lighting. replace (e) windows (alum frame) with new steel frame to match (e)(1-18)&replace (e) wood frame windows to match (e)(19-25)& doors(32-33),other interior doors to code.Details
unit 6 interior remodel including kitchen & bathrooms.remove non structural partitions.install new walls as noted.new lighting. replace (e) windows (alum frame) with new steel frame to match (e)(1-18)&replace (e) wood frame windows to match (e)(19-25)& doors(32-33),other interior doors to code. | $1,800,000 |
| May 18, 2006 | Completed final sign-off Aug 2006 | 2127 Broadway | repair water damage from unit above. bedroom #2 replace ceiling and carpet, kitchen replace wood floor. paint touch up in both rooms.Details
repair water damage from unit above. bedroom #2 replace ceiling and carpet, kitchen replace wood floor. paint touch up in both rooms. | $30,000 |
| Feb 11, 2005 | Completed final sign-off Feb 2006 | 2127 Broadway | remodel kitchen repaircabinets, counter tops, applicances. remodel master & guest baths, new vanitysDetails
remodel kitchen repaircabinets, counter tops, applicances. remodel master & guest baths, new vanitys | $200,000 |
| Feb 4, 2005 | Completed final sign-off Jul 2005 | 1070 Green St | remove & replace kitchen cabs & appliances, add wood flrs, add new doors, new bathroom tile & plumbiDetails
remove & replace kitchen cabs & appliances, add wood flrs, add new doors, new bathroom tile & plumbi | $95,000 |
| Aug 12, 2004 | Completed final sign-off Feb 2005 | 2185 Bush St | #206- remodel kitchen,new cabinets,countertops,appliances.remodel bath,new fixtures,tile,2 vanities.Details
#206- remodel kitchen,new cabinets,countertops,appliances.remodel bath,new fixtures,tile,2 vanities. | $60,000 |
| Jun 30, 2004 | Completed final sign-off Dec 2004 | 289 Magellan Av | remodel kitchen,new cabinets,countertop,new appliances,refinish (e)wood floor,remodel bath,new tub,Details
remodel kitchen,new cabinets,countertop,new appliances,refinish (e)wood floor,remodel bath,new tub, | $75,000 |
| Oct 10, 2001 | Completed final sign-off Jan 2002 | 113 Locust St | rev. to appl#9918634 storage & kitchen area opened upto butler pantryDetails
rev. to appl#9918634 storage & kitchen area opened upto butler pantry | $1,000 |
| Jul 27, 2001 | Completed final sign-off Dec 2001 | 115 Dorantes Av | remove stucco at rear of building/add new counter top in kitchen, paint, refinishDetails
remove stucco at rear of building/add new counter top in kitchen, paint, refinish | $30,000 |
| Dec 11, 2000 | Completed final sign-off Nov 2001 | 3993 Washington St | interior remodel (kitchen,bathroom,living rooms and master bedroom of exitg. condominum 2 new skyligDetails
interior remodel (kitchen,bathroom,living rooms and master bedroom of exitg. condominum 2 new skylig | $375,000 |
| May 8, 2000 | Completed final sign-off Sep 2000 | 2785 Jackson St | remodel existing kitchen, install new cabients,counters, appliancesDetails
remodel existing kitchen, install new cabients,counters, appliances | $25,000 |