Back to bathroom remodel contractors
J M K Construction Inc
- Based in
- Pacifica
- On San Francisco permits
- Jan 2000 to Jan 2022
- Last 24 months
- 0 permits filed
174 permits since 2000: 118 completed, 22 never finaled, 34 expired or cancelled.
Of the 22 never-finaled permits, 4 are 5 to 10 years old, 18 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 17 completed, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 8, 2020 | Completed final sign-off Dec 2020 | 47 Jordan Av | to replace 13 window sashes. to move a bathroom and reconfigure room on bedroom level. to remove a fireplace.Details
to replace 13 window sashes. to move a bathroom and reconfigure room on bedroom level. to remove a fireplace. | $10,000 |
| Oct 9, 2019 | Completed final sign-off Mar 2021 | 2269 Washington St | addition of an elevator at all floors. remodel of kitchen, laundry, powder rooms and bathroomsDetails
addition of an elevator at all floors. remodel of kitchen, laundry, powder rooms and bathrooms | $295,000 |
| Aug 21, 2019 | Never finaled issued Aug 2019, no final | 946 Stockton St | unit 17f: kitchen (60 sq. ft.) & bath (40 sq. ft.) renewal, new cabinets & counters, tile shower, no structural alterations.Details
unit 17f: kitchen (60 sq. ft.) & bath (40 sq. ft.) renewal, new cabinets & counters, tile shower, no structural alterations. | $22,000 |
| Jul 19, 2017 | Completed final sign-off Nov 2017 | 250 Laurel St | repair moisture damage in guest bath, removal of drywall & case work & replace in kind.Details
repair moisture damage in guest bath, removal of drywall & case work & replace in kind. | $5,000 |
| Aug 31, 2016 | Never finaled issued Aug 2016, no final | 332 Douglass St | remodel (e) bath, replace tub, vanity, toilet and tile. existing floor plan to remain. remodel home office, new drywall installed. replace 3 old aluminum windows with new retrofit milgard. replace 2 damage skylights. no change to layoutDetails
remodel (e) bath, replace tub, vanity, toilet and tile. existing floor plan to remain. remodel home office, new drywall installed. replace 3 old aluminum windows with new retrofit milgard. replace 2 damage skylights. no change to layout | $22,000 |
| Jan 20, 2016 | Completed final sign-off Dec 2018 | 169 Upper Tr | interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel.Details
interior remodel, lower portion of 1st fl to be level with rear grade. add elevator, remove all openings on west facade. replace all windows. 1/f to include sitting rm, bedroom & full bath; 2/f to include kitchen remodel; 3/f to include full & half bath remodel. | $440,000 |
| Oct 7, 2015 | Completed final sign-off Jul 2016 | 61 Jordan Av | install new kitchen cabinets & counter. replace/repair 2 existing dry rotted windows in kind. remodel existing bath with new. fixtures & tile. no structural changes.Details
install new kitchen cabinets & counter. replace/repair 2 existing dry rotted windows in kind. remodel existing bath with new. fixtures & tile. no structural changes. | $55,000 |
| Apr 5, 2013 | Completed final sign-off Jun 2018 | 1717 Broderick St | new interior remodel to (e) bathroom. new rear bay window, replace (e) rear windows & door. repair (e) rear deck in kind as neccessaryDetails
new interior remodel to (e) bathroom. new rear bay window, replace (e) rear windows & door. repair (e) rear deck in kind as neccessary | $85,000 |
| Nov 28, 2011 | Completed final sign-off Sep 2020 | 1001 California St | revision to 201009020171. all changes are bubbled and confined to unit 2. redesigned stair and bath layouts. all structural limited to stair layout revisionsDetails
revision to 201009020171. all changes are bubbled and confined to unit 2. redesigned stair and bath layouts. all structural limited to stair layout revisions | |
| Oct 6, 2011 | Completed final sign-off Jan 2012 | 230 Cervantes Bl | remodel of existing bathroom, install new tile shower, new vanity, new toilet and new faucet & shower mixer, no structure changes to be done, lighting shall be high efficacyDetails
remodel of existing bathroom, install new tile shower, new vanity, new toilet and new faucet & shower mixer, no structure changes to be done, lighting shall be high efficacy | $9,000 |
| Oct 25, 2007 | Never finaled issued Oct 2007, no final | 3501 Jackson St | remodel existing bathroom at 1st floor. no exterior changes. no structural changes. new fixtures located to same positions as existing.Details
remodel existing bathroom at 1st floor. no exterior changes. no structural changes. new fixtures located to same positions as existing. | $15,000 |
| Sep 28, 2007 | Completed final sign-off Sep 2008 | 3501 Jackson St | new elevator, basement remodel, garage conversion to wine storage room, office conversion to new bath, kitchen remodel, master bath remodel, third floor bedroom remodelDetails
new elevator, basement remodel, garage conversion to wine storage room, office conversion to new bath, kitchen remodel, master bath remodel, third floor bedroom remodel | $425,000 |
| Nov 6, 2006 | Completed final sign-off Dec 2007 | 2288 Broadway | unit 6 interior remodel including kitchen & bathrooms.remove non structural partitions.install new walls as noted.new lighting. replace (e) windows (alum frame) with new steel frame to match (e)(1-18)&replace (e) wood frame windows to match (e)(19-25)& doors(32-33),other interior doors to code.Details
unit 6 interior remodel including kitchen & bathrooms.remove non structural partitions.install new walls as noted.new lighting. replace (e) windows (alum frame) with new steel frame to match (e)(1-18)&replace (e) wood frame windows to match (e)(19-25)& doors(32-33),other interior doors to code. | $1,800,000 |
| Feb 11, 2005 | Completed final sign-off Feb 2006 | 2127 Broadway | remodel kitchen repaircabinets, counter tops, applicances. remodel master & guest baths, new vanitysDetails
remodel kitchen repaircabinets, counter tops, applicances. remodel master & guest baths, new vanitys | $200,000 |
| Feb 4, 2005 | Completed final sign-off Jul 2005 | 1070 Green St | remove & replace kitchen cabs & appliances, add wood flrs, add new doors, new bathroom tile & plumbiDetails
remove & replace kitchen cabs & appliances, add wood flrs, add new doors, new bathroom tile & plumbi | $95,000 |
| Jan 12, 2005 | Expired or cancelled expired Apr 2011 | 2965 Clay St | removel 3 baths, demo old fixtures and tile. replace with new plumbinb fixtures and tile. plumbingDetails
removel 3 baths, demo old fixtures and tile. replace with new plumbinb fixtures and tile. plumbing | $32,500 |
| Aug 12, 2004 | Completed final sign-off Feb 2005 | 2185 Bush St | #206- remodel kitchen,new cabinets,countertops,appliances.remodel bath,new fixtures,tile,2 vanities.Details
#206- remodel kitchen,new cabinets,countertops,appliances.remodel bath,new fixtures,tile,2 vanities. | $60,000 |
| Jun 30, 2004 | Completed final sign-off Dec 2004 | 289 Magellan Av | remodel kitchen,new cabinets,countertop,new appliances,refinish (e)wood floor,remodel bath,new tub,Details
remodel kitchen,new cabinets,countertop,new appliances,refinish (e)wood floor,remodel bath,new tub, | $75,000 |
| Jun 10, 2004 | Completed final sign-off Nov 2004 | 139 24th Av | remodel master bathroom, new tub/fixtures electrical heat floor. new bath vanity top & fixtures. repDetails
remodel master bathroom, new tub/fixtures electrical heat floor. new bath vanity top & fixtures. rep | $20,000 |
| May 10, 2001 | Completed final sign-off Mar 2002 | 1506 Willard St | remodel part of (e) lower story with bath & bedrm, add a recreation rm entire under (e) living areaDetails
remodel part of (e) lower story with bath & bedrm, add a recreation rm entire under (e) living area | $150,000 |
| Dec 11, 2000 | Completed final sign-off Nov 2001 | 3993 Washington St | interior remodel (kitchen,bathroom,living rooms and master bedroom of exitg. condominum 2 new skyligDetails
interior remodel (kitchen,bathroom,living rooms and master bedroom of exitg. condominum 2 new skylig | $375,000 |