J M Construction Llc
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2015 to Jul 2025
- Last 24 months
- 11 permits filed
60 permits since 2000: 37 completed, 8 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
5 deck permits: 2 completed, 1 never finaled, 2 expired or cancelled. Typically 208 days from filing to permit and 348 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 5, 2021 | Completed final sign-off Oct 2022 | 215 Shields St | add deck at 2nd fl, rear of bldg.Details
add deck at 2nd fl, rear of bldg. | $30,000 |
| Jun 6, 2019 | Completed final sign-off Oct 2021 | 1426 Santiago St | 2nd flr- bath remodel, 1st flr - one bedroom, one family room., one bath. add deck at rear t\less than 10'-0" ht abv gradeDetails
2nd flr- bath remodel, 1st flr - one bedroom, one family room., one bath. add deck at rear t\less than 10'-0" ht abv grade | $70,000 |
| Feb 28, 2019 | Expired or cancelled expired Jul 2023 | 1856 28th Av | revision to pa 2016-1117-2971 and 2017-0105-6574 1st fl - remove proposed mud room; relocate main entrance for unit b; create partition wall between hallway and bedroom; relocate furnace; water heaters; relocate bicycle parking; 2nd fl - remove proposed deck; relcoate staircase to 1st fl @ rear;Details
revision to pa 2016-1117-2971 and 2017-0105-6574 1st fl - remove proposed mud room; relocate main entrance for unit b; create partition wall between hallway and bedroom; relocate furnace; water heaters; relocate bicycle parking; 2nd fl - remove proposed deck; relcoate staircase to 1st fl @ rear; | |
| Jan 5, 2017 | Never finaled issued Aug 2017, no final | 1020 Plymouth Av | legalize as built unit (unit #2) on 1st flr with two bdrms, one storage rm, den, kitchen & three full bathrooms per plan. add (n) deck on 2nd flr to provide access to rear yard for (e) unit (unit #1) @ rear of bldg per plan. unit legalization ord 43-14Details
legalize as built unit (unit #2) on 1st flr with two bdrms, one storage rm, den, kitchen & three full bathrooms per plan. add (n) deck on 2nd flr to provide access to rear yard for (e) unit (unit #1) @ rear of bldg per plan. unit legalization ord 43-14 | $21,000 |
| Jan 5, 2017 | Expired or cancelled expired Jul 2023 | 1856 28th Av | legalize as built unit (unit b) on 1st flr w/ three bdrms, two full bathrooms, kitchen, laundry & mud room per plans. add deck on 2nd flr @ rear of bldg to provide rear yard access for (e) unit (unit a) per plans. unit legalization ord 43-14.Details
legalize as built unit (unit b) on 1st flr w/ three bdrms, two full bathrooms, kitchen, laundry & mud room per plans. add deck on 2nd flr @ rear of bldg to provide rear yard access for (e) unit (unit a) per plans. unit legalization ord 43-14. | $21,000 |