Back to bathroom remodel contractors
J M Construction Llc
- Based in
- South San Francisco
- On San Francisco permits
- Nov 2015 to Jul 2025
- Last 24 months
- 11 permits filed
60 permits since 2000: 37 completed, 8 in progress, 6 never finaled, 9 expired or cancelled.
Of the 6 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
20 bathroom remodel permits: 15 completed, 1 never finaled, 4 expired or cancelled. Typically 78 days from filing to permit and 388 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 25, 2025 | Completed final sign-off Feb 2026 | 224 Clayton St | 3/f: relocate the kitchen, living room and bedroom. add a powder, w.i.c and master bathroom. ref permit 202411275861 remodel on 1/f and 2/f.Details
3/f: relocate the kitchen, living room and bedroom. add a powder, w.i.c and master bathroom. ref permit 202411275861 remodel on 1/f and 2/f. | $100,000 |
| Nov 27, 2024 | Completed final sign-off Mar 2026 | 224 Clayton St | 1st fl, remove post. fire sprinkler permit to be deferred. 2nd fl relocate kitchen, living room, bedroom, add a powder room, wic, master bath.Details
1st fl, remove post. fire sprinkler permit to be deferred. 2nd fl relocate kitchen, living room, bedroom, add a powder room, wic, master bath. | $200,000 |
| Jan 25, 2022 | Completed final sign-off Mar 2023 | 434 03rd Av | rev to pa20107124416 & 201811276759: 1/f: relocate w/h & furnace; reconfig staircase to 2/f. 2/f:relocate three 3-fixture full bathroom, add closets to bedrooms, relocate kitchen, add dining room. 3/f: relocate 3-fiture full bathroom at rear. relocate kitchen, add closet.Details
rev to pa20107124416 & 201811276759: 1/f: relocate w/h & furnace; reconfig staircase to 2/f. 2/f:relocate three 3-fixture full bathroom, add closets to bedrooms, relocate kitchen, add dining room. 3/f: relocate 3-fiture full bathroom at rear. relocate kitchen, add closet. | $30,000 |
| Sep 23, 2021 | Completed final sign-off Nov 2024 | 700 Victoria St | 1st fl: add an equipment, 2 bedrooms, a mech/laundry, one office, one media room, and three full bath rooms, reconfigure interior stair between floors. 2nd fl: remove walls to create open flr plan layout. kitchen, two bathrooms remodel. add skylight. replace all windows with aluminum clad wood.Details
1st fl: add an equipment, 2 bedrooms, a mech/laundry, one office, one media room, and three full bath rooms, reconfigure interior stair between floors. 2nd fl: remove walls to create open flr plan layout. kitchen, two bathrooms remodel. add skylight. replace all windows with aluminum clad wood. | $50,000 |
| Aug 31, 2021 | Completed final sign-off Aug 2024 | 151 Commonwealth Av | basement fl - convert storage area into 2 bedrooms, 2 (3) fixture bathrooms, wic and entertainment room, laundry & mechanical room; reconfigure interior stair between basement & 1st floor. add a roof drain on the front.Details
basement fl - convert storage area into 2 bedrooms, 2 (3) fixture bathrooms, wic and entertainment room, laundry & mechanical room; reconfigure interior stair between basement & 1st floor. add a roof drain on the front. | $40,000 |
| Apr 21, 2021 | Completed final sign-off Dec 2023 | 1430 19th Av | remodel 3 bathrooms on 2/f & 1 kitchen.Details
remodel 3 bathrooms on 2/f & 1 kitchen. | $30,000 |
| Aug 8, 2019 | Completed final sign-off Sep 2022 | 305 Walnut St | 1st fl - reconfigure int layout w/1 bedrm, 1 media, family rm, bath & laundry; in-fill north side lightwell; 2nd fl - reconfigure int layout w/2 bedrms, 3 baths, laundry rm, kitchen & living rm; in-fill north side lightwell; relocate primary entrance; 3rd fl - reconfigure int layout attic; conditionDetails
1st fl - reconfigure int layout w/1 bedrm, 1 media, family rm, bath & laundry; in-fill north side lightwell; 2nd fl - reconfigure int layout w/2 bedrms, 3 baths, laundry rm, kitchen & living rm; in-fill north side lightwell; relocate primary entrance; 3rd fl - reconfigure int layout attic; condition | $80,000 |
| Aug 1, 2019 | Completed final sign-off Jun 2025 | 333 Magellan Av | 3rd fl - remodel bedrooms, add 1 full bath and laundry; 2nd fl - remodel kitchen, half bath and play room; 1st fl - remodel family, add 1 bedroom and 1 full bath. reconfigure the interior staircase. replace all windowsDetails
3rd fl - remodel bedrooms, add 1 full bath and laundry; 2nd fl - remodel kitchen, half bath and play room; 1st fl - remodel family, add 1 bedroom and 1 full bath. reconfigure the interior staircase. replace all windows | $85,000 |
| Jun 6, 2019 | Completed final sign-off Oct 2021 | 1426 Santiago St | 2nd flr- bath remodel, 1st flr - one bedroom, one family room., one bath. add deck at rear t\less than 10'-0" ht abv gradeDetails
2nd flr- bath remodel, 1st flr - one bedroom, one family room., one bath. add deck at rear t\less than 10'-0" ht abv grade | $70,000 |
| Apr 30, 2019 | Completed final sign-off Jun 2019 | 2028 Mcallister St | revise pa 201708013485. 1st flr -(n) tankless water & boiler for radiant heat, reconfig bathrms & w.i.c layout. 2nd flr -replace exterior stair in-kind, remove pantry at kitch, add closet at office, reconfig bath & laundry layout, (n) 8 ft ht wooden fence at rear yard. 3rd flr- reconfig master bath.Details
revise pa 201708013485. 1st flr -(n) tankless water & boiler for radiant heat, reconfig bathrms & w.i.c layout. 2nd flr -replace exterior stair in-kind, remove pantry at kitch, add closet at office, reconfig bath & laundry layout, (n) 8 ft ht wooden fence at rear yard. 3rd flr- reconfig master bath. | $20,000 |
| Apr 11, 2019 | Expired or cancelled expired Jan 2026 | 1022 Plymouth Av | rev to pa# 201611183102; reconfigure master bathroom layoutDetails
rev to pa# 201611183102; reconfigure master bathroom layout | |
| Mar 29, 2018 | Completed final sign-off Oct 2018 | 101 San Ramon Wy | turn (e) kitchen area into bedroom on 2nd. relocate kitchen to (e) dining area on 2nd. remodel & relocate (e) bathrooms on 2nd flr maher naDetails
turn (e) kitchen area into bedroom on 2nd. relocate kitchen to (e) dining area on 2nd. remodel & relocate (e) bathrooms on 2nd flr maher na | $30,000 |
| Feb 20, 2018 | Completed final sign-off Jan 2021 | 15 Idora Av | upper story: enclose extg staircase under extg roof. lower story: addition of 1'6" x 5'10" under extg bldg overhang on south. addition of 1'6" x 24'5" under extg bldg overhang on east. add bathroom, bedroom and family room.Details
upper story: enclose extg staircase under extg roof. lower story: addition of 1'6" x 5'10" under extg bldg overhang on south. addition of 1'6" x 24'5" under extg bldg overhang on east. add bathroom, bedroom and family room. | $50,000 |
| Jan 16, 2018 | Completed final sign-off Jul 2018 | 41 Scott St | revision to 201708013490. relocate door for (e) bathroom on 3rd flr. per plan add a 3 fixture full bathroom on 3rd flr.Details
revision to 201708013490. relocate door for (e) bathroom on 3rd flr. per plan add a 3 fixture full bathroom on 3rd flr. | $20,000 |
| Dec 7, 2017 | Completed final sign-off Oct 2018 | 101 San Ramon Wy | revision to bpa #201704254859. reconfigure side stair between garage and main structure to accommodate access to existing main panel. reconfigure two existing bathroom on the 1st floor per plan. maher naDetails
revision to bpa #201704254859. reconfigure side stair between garage and main structure to accommodate access to existing main panel. reconfigure two existing bathroom on the 1st floor per plan. maher na | |
| Apr 25, 2017 | Completed final sign-off Oct 2018 | 101 San Ramon Wy | 1) add four bedrooms, 2 bathrooms, one powder room and mech. room on basement per planDetails
1) add four bedrooms, 2 bathrooms, one powder room and mech. room on basement per plan | $45,000 |
| Jan 5, 2017 | Never finaled issued Aug 2017, no final | 1020 Plymouth Av | legalize as built unit (unit #2) on 1st flr with two bdrms, one storage rm, den, kitchen & three full bathrooms per plan. add (n) deck on 2nd flr to provide access to rear yard for (e) unit (unit #1) @ rear of bldg per plan. unit legalization ord 43-14Details
legalize as built unit (unit #2) on 1st flr with two bdrms, one storage rm, den, kitchen & three full bathrooms per plan. add (n) deck on 2nd flr to provide access to rear yard for (e) unit (unit #1) @ rear of bldg per plan. unit legalization ord 43-14 | $21,000 |
| Jan 5, 2017 | Expired or cancelled expired Jul 2023 | 1856 28th Av | legalize as built unit (unit b) on 1st flr w/ three bdrms, two full bathrooms, kitchen, laundry & mud room per plans. add deck on 2nd flr @ rear of bldg to provide rear yard access for (e) unit (unit a) per plans. unit legalization ord 43-14.Details
legalize as built unit (unit b) on 1st flr w/ three bdrms, two full bathrooms, kitchen, laundry & mud room per plans. add deck on 2nd flr @ rear of bldg to provide rear yard access for (e) unit (unit a) per plans. unit legalization ord 43-14. | $21,000 |
| Nov 18, 2016 | Expired or cancelled expired Jan 2026 | 1022 Plymouth Av | 1)remodel kitchen and dining room,add one master bedroom and 2 bathrooms on 2nd floor per plan.Details
1)remodel kitchen and dining room,add one master bedroom and 2 bathrooms on 2nd floor per plan. | $20,000 |
| Nov 12, 2015 | Expired or cancelled expired Oct 2022 | 2740 Mcallister St | vertical addition: renovate (e) 1 unit residential bldg add-2 units for total of 3 units. 9 bedrooms & 6 bathrooms for all units.Details
vertical addition: renovate (e) 1 unit residential bldg add-2 units for total of 3 units. 9 bedrooms & 6 bathrooms for all units. | $250,000 |