J & J South West Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to May 2019
- Last 24 months
- 0 permits filed
60 permits since 2000: 39 completed, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 6 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 2 completed, 1 expired or cancelled. Typically 1 days from filing to permit and 64 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 14, 2018 | Expired or cancelled withdrawn Feb 2026 | 733 Holloway Av | repair existing secondary stair in kind, to comply with nov #201712501 and 201705241, remodel a full bath in 3rd fl unit and remove one none-structural wall to create large family room and adding lights on ground floor.Details
repair existing secondary stair in kind, to comply with nov #201712501 and 201705241, remodel a full bath in 3rd fl unit and remove one none-structural wall to create large family room and adding lights on ground floor. | $23,000 |
| Mar 31, 2017 | Completed final sign-off May 2017 | 2131 Grove St | repair (e) stair on east side of the property in kind re-paint stair to comply with nov 201759751 not to excedd 50%Details
repair (e) stair on east side of the property in kind re-paint stair to comply with nov 201759751 not to excedd 50% | $5,500 |
| Apr 8, 2013 | Completed final sign-off Jul 2013 | 179 Lee Av | comply with nov# 201387541, 201386211 & 201386212-remove brace metals from adjacent neighbor's stair & provide new brace per plan. replace (e) asphalt shingle at (e) gable roof. provide dry rod wood, repair (e) rear flat roof, ceiling walls in kindDetails
comply with nov# 201387541, 201386211 & 201386212-remove brace metals from adjacent neighbor's stair & provide new brace per plan. replace (e) asphalt shingle at (e) gable roof. provide dry rod wood, repair (e) rear flat roof, ceiling walls in kind | $5,000 |