Back to kitchen remodel contractors
J & J South West Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2012 to May 2019
- Last 24 months
- 0 permits filed
60 permits since 2000: 39 completed, 14 never finaled, 7 expired or cancelled.
Of the 14 never-finaled permits, 6 are 5 to 10 years old, 8 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
14 kitchen remodel permits: 10 completed, 3 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 416 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 18, 2018 | Completed final sign-off Oct 2019 | 1175 Howard St | interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a.Details
interior renovation of gr fl of approx 3400 sf including replacement of e kitchen caginets, counters and fixtures, e lighting in multi function space, existing accordion doors, air handling unit and minor ceiling partition adjustments, new pain interior and exterior. maher n/a. | $86,000 |
| Mar 14, 2018 | Completed final sign-off May 2019 | 490 Connecticut St | remodel (e) kitchen & bathroom. replace 8 led lights in bedrooms in unit #1Details
remodel (e) kitchen & bathroom. replace 8 led lights in bedrooms in unit #1 | $30,000 |
| Sep 12, 2017 | Never finaled issued Sep 2017, no final | 1542 41st Av | remodel existing kitchen and bathroom on 2nd floorDetails
remodel existing kitchen and bathroom on 2nd floor | $12,000 |
| Jan 25, 2017 | Completed final sign-off Jun 2019 | 3318 Scott St | remodel e 2nd and 3rd fl. 2 kitchens 2, 1/2 baths and replace gas fireplace. install new efficacy led ceiling lights in both units. n/a maherDetails
remodel e 2nd and 3rd fl. 2 kitchens 2, 1/2 baths and replace gas fireplace. install new efficacy led ceiling lights in both units. n/a maher | $50,000 |
| Dec 29, 2016 | Completed final sign-off May 2018 | 1642 08th Av | remodel (e) kitchen. new cabs and counter. remodel 2nd/ bathroom. no walls to be altered or removed.Details
remodel (e) kitchen. new cabs and counter. remodel 2nd/ bathroom. no walls to be altered or removed. | $6,000 |
| Apr 19, 2016 | Expired or cancelled expired Jan 2019 | 356 Willard North St | remodel (4) bathrooms, 1/2 bathroom and (1) kitchen. no walls to be removed or alteredDetails
remodel (4) bathrooms, 1/2 bathroom and (1) kitchen. no walls to be removed or altered | $23,000 |
| Mar 1, 2016 | Completed final sign-off Dec 2018 | 372 Polaris Wy | comply w/ nov 201695791 -remodel kitchen, living room, skylight. two bathrooms on 2nd floor.Details
comply w/ nov 201695791 -remodel kitchen, living room, skylight. two bathrooms on 2nd floor. | $30,000 |
| Jan 14, 2016 | Never finaled issued Feb 2016, no final | 81 San Andreas Wy | add new bedroom, 1 bathroom in hallway area. utility room in basement area. remodel (e) kitchen. maher naDetails
add new bedroom, 1 bathroom in hallway area. utility room in basement area. remodel (e) kitchen. maher na | $20,000 |
| Nov 4, 2015 | Never finaled issued Nov 2015, no final | 2625 Franklin St | remove unit 304. kitchen and bathroom cabinets and replace cabinets, counter tops and retile bathroom and replace dry rot if needed. no electrical works.Details
remove unit 304. kitchen and bathroom cabinets and replace cabinets, counter tops and retile bathroom and replace dry rot if needed. no electrical works. | $12,000 |
| Jan 9, 2015 | Completed final sign-off Jun 2015 | 3125 Folsom St | 3125 & 3127 -rev. to permit 201406057628; relocate, kitchen, bathroom and bedrooms; no structural work.Details
3125 & 3127 -rev. to permit 201406057628; relocate, kitchen, bathroom and bedrooms; no structural work. | $20,000 |
| Dec 8, 2014 | Completed final sign-off Feb 2016 | 632 Sawyer St | comply with compliant #201498201. legalize and modify 2 bedrooms, one full bathroom and one laundry room on 1st floor per plan. remove unpermitted kitchen on 1st floor per plan and remove all plumbing fixtures and utility outlets from its source.Details
comply with compliant #201498201. legalize and modify 2 bedrooms, one full bathroom and one laundry room on 1st floor per plan. remove unpermitted kitchen on 1st floor per plan and remove all plumbing fixtures and utility outlets from its source. | $30,000 |
| Oct 28, 2014 | Completed final sign-off Sep 2016 | 2030 Vallejo St | to comply with nov #201461541. replace extg kitchen cabinets and counter top. replace 4 gfic receptacles. no plumbing work.Details
to comply with nov #201461541. replace extg kitchen cabinets and counter top. replace 4 gfic receptacles. no plumbing work. | $10,000 |
| Jun 10, 2014 | Completed final sign-off Jul 2015 | 558 20th Av | 3rd floor remodel: convert (e) powder droom to laundry room, convert (e) utility room to master bathroom, remodel exiting kitchen.Details
3rd floor remodel: convert (e) powder droom to laundry room, convert (e) utility room to master bathroom, remodel exiting kitchen. | $20,000 |
| Jul 8, 2013 | Completed final sign-off Feb 2014 | 144 Seville St | remove an extg cook top and change the kitchen into wet bar area. change the extg bedroom to storage room. legalize all rooms at ground floor.Details
remove an extg cook top and change the kitchen into wet bar area. change the extg bedroom to storage room. legalize all rooms at ground floor. | $3,000 |