Back to kitchen remodel contractors
J Construction Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jul 2024 to Sep 2026
- Last 24 months
- 16 permits filed
19 permits since 2000: 11 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 3 in progress. Typically 0 days from filing to permit and 113 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 11, 2026 | In progress issued Jun 2026 | 15 Westgate Dr | revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection.Details
revision to permit 202507281716 to add deck over portion of 2nd floor. revise kitchen layout and revise special inspection. | $25,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 2601 Hyde St | revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance...Details
revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance... | $3,000 |
| Sep 16, 2025 | In progress issued Feb 2026 | 15 Westgate Dr | 2-story horizontal addition in (e) light well south side enlarging kitchen & storage space below. horizontal addition at 3/f over a portion of 2nd story roof will accomodate rebuilding of (e) stair to be code compliant. (e) kitchen will be remodeled.Details
2-story horizontal addition in (e) light well south side enlarging kitchen & storage space below. horizontal addition at 3/f over a portion of 2nd story roof will accomodate rebuilding of (e) stair to be code compliant. (e) kitchen will be remodeled. | $300,000 |
| Jul 1, 2025 | Completed final sign-off Oct 2025 | 755 Florida St | unit #3: installl new kitchen like for like cabinetry appliances, finshes fixtures, countertopDetails
unit #3: installl new kitchen like for like cabinetry appliances, finshes fixtures, countertop | $15,000 |
| Nov 7, 2024 | Completed final sign-off Sep 2025 | 1830 Jackson St | unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow.Details
unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow. | $520,000 |
| Jul 18, 2024 | Completed final sign-off Sep 2024 | 2890 California St | kitchen remodel- replace in kind cabinets and appliances. add dishwasher/disposal. replace (e) subpanel. ste 602Details
kitchen remodel- replace in kind cabinets and appliances. add dishwasher/disposal. replace (e) subpanel. ste 602 | $30,000 |