Back to bathroom remodel contractors
J Construction Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jul 2024 to Sep 2026
- Last 24 months
- 16 permits filed
19 permits since 2000: 11 completed, 8 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 0 days from filing to permit and 215 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | Completed final sign-off Sep 2026 | 424 Ellis St | unit 506, unit 410: bathroom remodel like for like. unit new subpanels. unit 605: bathroom remodel: like for like.Details
unit 506, unit 410: bathroom remodel like for like. unit new subpanels. unit 605: bathroom remodel: like for like. | $80,000 |
| Mar 13, 2026 | In progress issued Mar 2026 | 2601 Hyde St | revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance...Details
revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance... | $3,000 |
| Nov 7, 2024 | Completed final sign-off Sep 2025 | 1830 Jackson St | unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow.Details
unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow. | $520,000 |