Back to bathroom remodel contractors
J Construction Solutions
- Based in
- San Francisco
- On San Francisco permits
- Jul 2024 to Nov 2026
- Last 24 months
- 18 permits filed
22 permits since 2000: 12 completed, 10 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Where they worked
- Single-family 2
- Multi-family (2-family, apartments) 2
- Commercial 0
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 in progress. Typically 30 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 23, 2026 | In progress issued Nov 2026 | 47 Clarion Al | (rear cottage): comprehensive remodel of e) cottage. n) concrete footing & slab on grade. remodel 1 kitchen, 1 bath, 1 living rm, 1 bedroom, new mep. work in front of building as needed for utility connections, sprnklers @ corridor & fire access req.Details
(rear cottage): comprehensive remodel of e) cottage. n) concrete footing & slab on grade. remodel 1 kitchen, 1 bath, 1 living rm, 1 bedroom, new mep. work in front of building as needed for utility connections, sprnklers @ corridor & fire access req. | $150,000 |
| Apr 7, 2026 | Completed final sign-off Sep 2026 | 424 Ellis St | unit 506, unit 410: bathroom remodel like for like. unit new subpanels. unit 605: bathroom remodel: like for like.Details
unit 506, unit 410: bathroom remodel like for like. unit new subpanels. unit 605: bathroom remodel: like for like. | $80,000 |
| Mar 13, 2026 | Completed final sign-off Nov 2026 | 2601 Hyde St | revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance...Details
revision 202504144374- to include switching locations of master bathroom and closet, relocation of plumbing fixtures and appliances in the kitchen, enclosure of dining room with a (n) arched doorway modification of shower enclosure in teh bathroom, addition of (n) door at second level entrance... | $3,000 |
| Nov 7, 2024 | Completed final sign-off Sep 2025 | 1830 Jackson St | unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow.Details
unit# e on 2/f: remodel unit# e to include all flooring, elec, plumbing, sheetrock in all kitchen, bathrooms, bedrooms, living areas and studies. add one new bathroom. replace window in kind, not visible from prow. | $520,000 |