Back to kitchen remodel contractors
J C General Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 8 permits filed
46 permits since 2000: 32 completed, 7 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
19 kitchen remodel permits: 13 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 242 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 30 Beckett St | remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath.Details
remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath. | $30,000 |
| Aug 10, 2026 | In progress issued Aug 2026 | 861 Brussels St | kitchen remodel. cabinet replace. outlet, switch, garbage disposal replace. kitchen sink & faucet replace. kitchen floor replace.Details
kitchen remodel. cabinet replace. outlet, switch, garbage disposal replace. kitchen sink & faucet replace. kitchen floor replace. | $20,000 |
| Dec 30, 2024 | Completed final sign-off Apr 2026 | 182 Tioga Av | comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only.Details
comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only. | $6,500 |
| Sep 24, 2024 | In progress issued Jan 2025 | 445 Irving St | unit a: one kitchen and one bath remodel, replace the unit flooringDetails
unit a: one kitchen and one bath remodel, replace the unit flooring | $40,000 |
| Mar 25, 2024 | Expired or cancelled expired Nov 2025 | 722 34th Av | one kitchen and 2 bathroom remodel replace flooring. no layout changesDetails
one kitchen and 2 bathroom remodel replace flooring. no layout changes | $35,000 |
| May 16, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kindDetails
leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kind | $40,000 |
| Mar 24, 2023 | Never finaled issued May 2023, no final | 545 Taraval St | interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251Details
interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251 | $50,000 |
| Dec 19, 2022 | Completed final sign-off Mar 2023 | 1467 Mckinnon Av | one kitchen remodeling, non structuralDetails
one kitchen remodeling, non structural | $10,000 |
| May 9, 2022 | Completed final sign-off Apr 2025 | 2924 Sacramento St | remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yardDetails
remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yard | $30,000 |
| Mar 17, 2022 | Completed final sign-off Jan 2023 | 445 Irving St | remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen.Details
remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen. | $20,000 |
| Jun 10, 2020 | Completed final sign-off Sep 2020 | 1253 47th Av | replace damaged drywall, cabinet ,counter top, reinstall the new appliance in kitchen. all work in kind.Details
replace damaged drywall, cabinet ,counter top, reinstall the new appliance in kitchen. all work in kind. | $15,000 |
| Feb 6, 2020 | Completed final sign-off Nov 2021 | 6 Arleta Av | revision to approved permit #201903296600. relocate kitchen cabinet & counter.Details
revision to approved permit #201903296600. relocate kitchen cabinet & counter. | |
| Dec 20, 2019 | Completed final sign-off Aug 2020 | 445 Irving St | unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wallDetails
unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wall | $30,000 |
| Sep 10, 2019 | Completed final sign-off Mar 2020 | 334 Victoria St | upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl.Details
upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl. | $56,000 |
| Jun 21, 2019 | Completed final sign-off Oct 2019 | 430 Green St | floor and counter top replacement in kind in kitchenDetails
floor and counter top replacement in kind in kitchen | $12,000 |
| Mar 29, 2019 | Completed final sign-off Nov 2021 | 6 Arleta Av | legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14Details
legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14 | $30,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 443 Irving St | remodel (e) kitchen & (e) bathroom.Details
remodel (e) kitchen & (e) bathroom. | $28,000 |
| Sep 1, 2017 | Completed final sign-off Nov 2017 | 64 Hiliritas Av | remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area.Details
remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area. | $8,000 |
| Feb 11, 2014 | Never finaled issued Oct 2014, no final | 639 Grand View Av | horizontal addition. add bedroom & family room @ basement level. relocate kitchen & living room to 1st floor. remodel 2nd floor.Details
horizontal addition. add bedroom & family room @ basement level. relocate kitchen & living room to 1st floor. remodel 2nd floor. | $300,000 |