Back to bathroom remodel contractors
J C General Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2014 to Aug 2026
- Last 24 months
- 8 permits filed
46 permits since 2000: 32 completed, 7 in progress, 4 never finaled, 3 expired or cancelled.
Of the 4 never-finaled permits, 2 are 3 to 5 years old, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 14 completed, 3 in progress, 1 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 272 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 11, 2026 | In progress issued Aug 2026 | 30 Beckett St | remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath.Details
remodel 3rd floor kitchen like to like. remodel 3rd floor half to full bath. | $30,000 |
| Mar 9, 2026 | In progress issued Mar 2026 | 263 Somerset St | comply to complaint #202651568: convert (e) bathroom into two full bath on 2nd floor. no structural alteration under this permit. no exterior work.Details
comply to complaint #202651568: convert (e) bathroom into two full bath on 2nd floor. no structural alteration under this permit. no exterior work. | $20,000 |
| Dec 30, 2024 | Completed final sign-off Apr 2026 | 182 Tioga Av | comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only.Details
comply w/ complaint #202432302: like to like kitchen & bathroom remodel w/ new counters, kitchen appliances, and plumbing fixtures. new flooring. re-wire electric & lighting. no layout change. all work on 2/f only. | $6,500 |
| Sep 24, 2024 | In progress issued Jan 2025 | 445 Irving St | unit a: one kitchen and one bath remodel, replace the unit flooringDetails
unit a: one kitchen and one bath remodel, replace the unit flooring | $40,000 |
| Mar 25, 2024 | Expired or cancelled expired Nov 2025 | 722 34th Av | one kitchen and 2 bathroom remodel replace flooring. no layout changesDetails
one kitchen and 2 bathroom remodel replace flooring. no layout changes | $35,000 |
| Sep 26, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | comply w/ complaint #202307925: revison to pa #202305167893 & 202305248447 - relocate bathroom & construct hallway to rear yard at g/f.Details
comply w/ complaint #202307925: revison to pa #202305167893 & 202305248447 - relocate bathroom & construct hallway to rear yard at g/f. | $2,000 |
| May 24, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | legalize bedroom, bathroom, & construct media room & wet bar at g/f. replace sheet rock w/ new at 2/f (revision under pa #202305167893.)Details
legalize bedroom, bathroom, & construct media room & wet bar at g/f. replace sheet rock w/ new at 2/f (revision under pa #202305167893.) | $235,150 |
| May 16, 2023 | Completed final sign-off Jul 2024 | 145 Arleta Av | leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kindDetails
leaking found in (2) bathroom, need to repair. remodel master & guest bathroom. upgrade the (1) kitchen at the same time. add insulation at same time. hvac in back need to replace. in-kind | $40,000 |
| Mar 24, 2023 | Never finaled issued May 2023, no final | 545 Taraval St | interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251Details
interior remodel on 2nd flr: remodel (e) kitchen and bathroom, add a study room. to comply w/ nov# 201972251 | $50,000 |
| Oct 6, 2022 | Completed final sign-off Nov 2022 | 1326 Shafter Av | comply with 202295421 and 202294683: remove bathroom gr fl. remove unpermitted plastic sheating from lightwell, clean and repair siding/dryrot at lightwell. new office 2nd fl. note: complaince w/nov shall be complete. no partical compliance.Details
comply with 202295421 and 202294683: remove bathroom gr fl. remove unpermitted plastic sheating from lightwell, clean and repair siding/dryrot at lightwell. new office 2nd fl. note: complaince w/nov shall be complete. no partical compliance. | $6,000 |
| May 9, 2022 | Completed final sign-off Apr 2025 | 2924 Sacramento St | remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yardDetails
remodel (e) kitchen and bathroom at 3rd floor. replace (e) plumbing fixtures within (e) bathrooms at 2nd floor. construct (n) retaining wall at rear yard | $30,000 |
| Mar 17, 2022 | Completed final sign-off Jan 2023 | 445 Irving St | remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen.Details
remodel the bathroom and kitchen. replace tiles, toilet, vanity in bath. replace cabinets, counter top, appliances & flooring in kitchen. | $20,000 |
| Dec 28, 2020 | Completed final sign-off Oct 2022 | 733 Laguna Honda Bl | project proposes for the addition of a 2 bedroom and one bathroom accessory dwelling unit at the ground level of a detached single family residence by converting the rear section of the existing garage within the existing building envelope.Details
project proposes for the addition of a 2 bedroom and one bathroom accessory dwelling unit at the ground level of a detached single family residence by converting the rear section of the existing garage within the existing building envelope. | $100,000 |
| Dec 20, 2019 | Completed final sign-off Aug 2020 | 445 Irving St | unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wallDetails
unit a: 9'x 8' kitchen & 3'x 8' bathroom remodel. no alterations wall | $30,000 |
| Sep 10, 2019 | Completed final sign-off Mar 2020 | 334 Victoria St | upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl.Details
upgrade (e) room & construct 1 full bath rm at ground fl.; remodel (e) kitchen, bath rm & convert (e) closet to half bath rm. at 2nd fl. | $56,000 |
| Mar 29, 2019 | Completed final sign-off Nov 2021 | 6 Arleta Av | legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14Details
legalize kitchen in (e) living space in 1st floor. change (e) toilet to a full bath per ordinance 43-14 | $30,000 |
| Feb 13, 2018 | Completed final sign-off Mar 2019 | 59 Buena Vista Tr | add entertainment, media room, office, den & 3 fixtures full bathroom on 1st floor per plan. add interior staircase to create interior connection between 1st and 2nd floor per planDetails
add entertainment, media room, office, den & 3 fixtures full bathroom on 1st floor per plan. add interior staircase to create interior connection between 1st and 2nd floor per plan | $35,000 |
| Sep 27, 2017 | Completed final sign-off Jan 2018 | 443 Irving St | remodel (e) kitchen & (e) bathroom.Details
remodel (e) kitchen & (e) bathroom. | $28,000 |
| Sep 1, 2017 | Completed final sign-off Nov 2017 | 64 Hiliritas Av | remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area.Details
remodel kitchen, replace tile, cabinets, new sinks & faucet, new lights and switches. bathroom: tile replacement in shower area. | $8,000 |